Irrigation & Flood Control               


|| IRRIGATION ||  LIFT IRRIGATION ||

IRRIGATION

Introduction:

            Boudh Irrigation Division is having jurisdiction of Irrigation activities of Boudh and Kandhamal Districts. The Irrigation activities in Boudh District is as follows.

i. Maintenance of Salki Irrigation Project

ii. Construction of Bagh Barrage Project.

1.SALKI IRRIGATION PROJECT :

            This is a diversion weir scheme constructed across river Salki near village Paljhar about 20 Km from Boudh town. The project was completed in the year 1972 at the capital cost of Rs. 250 lakhs. It is designed to provide irrigation to 19891 Ha. in Khariff and 1000 Ha. in Rabi in 252 villages in Boudh and Harbhanga Blocks of Boudh District. Salki Irrigation Project is a largest diversion weir Project in Orissa having a catchment area of 1638 Sq. Kms., constructed across river Salki near village Paljhar about 20 Km. from Boudh Town. River Salki is a longest tributary of river Mahanadi which originates from eastern ghat rangers (Baliguda range)  and after traversing hilly areas it confluence with river Mahanadi about 8 Km. from west of Boudh town.

                        This Project was taken of during the year 1960 at an estimated cost of 52.85 lakh and has completed on 1972 at a cost of 225.75 lakh. It is designed to provide irrigation 19891 Ha. in Kharif and 1000 Ha. in Rabi. The Project contemplated with two canal systems namely Right Main Canal and Left Main Canal having an ayacut area of 10556 Ha. and 9335 Ha. respectively. The Right Main Canal is 28 Km. long and a network of 138.21 Km of distribution system and design discharge of 10.76 cumecs. The Left Main Canal is 24 Km. long with 107 Km. of distribution system with a design discharge of 10.33 cumecs. This is the most successful irrigation Project which irrigates 19891 Ha. of ayacut in drought affected areas of Boudh and Harbhanga Block in Boudh district for last 37 years.

36 Nos. of Pani Panchayats with five Distributary committee and one Apex Committee has been formed as per Pani Panchayat Act for smooth management and distribution of water supply for 19891 Ha. ayacut in 216 nos. of villages of Boudh District.

Flood Protection Works (Mahanadi River) :-

                         Boudh Town and most of village of Boudh District situated on the right side of the river Mahanadi some part of Boudh Twon get flooded during high flood. Hence to protect Boudh Town an estimate amounting to Rs. 1458.76 lakhs has been approved by 11th TAC. The work has sanctioned by NABARD and tender invited on March 2011.

                        During this year 26 Nos. of works for Rs. 110.00 lakhs has takenup and completed.

12th Finance

                        3 Nos. of works for Rs. 15.00 lakhs has takenup and completed.

 2.BAGH BARRAGE PROJECT :

                The Bagh Barrage Medium Irrigation Project has been taken-up in November 1997 under NABARD assistance. The Project is being constructed across river Bagh at Sagada. The original cost estimated Rs. 4471 lakhs went an upward revision of Rs. 7564 lakhs and was due to the change in designs and enhanced cost of materials and labour. The project on completion as a whole will provide irrigation to 9660 Ha in Boudh and Kantamal Blocks of Boudh District.

                        Bagh Barrage Project envisages with construction of barrage of length 167 meters with vertically lifted gates across river Bagh near village Sagada of Boudh District and excavation of Left Main Canal of 24.27 Km. and its distribution system to achieve an ayacut of 9660 Ha. The location of barrage site is at village Sagada 20N 39’00 / 840  Eoo’02”. The revised cost of the Project is Rs. 7564.89 lakhs.

                     The project was proposed to take up under NABARD Assistance in phased manner. The Phase-I of the project has already been sanctioned by NABARD for Rs. 1915.04 lakhs ( NABARD share Rs. 1817.00 lakhs and State’s share Rs. 98.04 lakhs ). Later on, the cost of Phase-I has been revised to Rs. 3253.21 lakhs for which estimates have already been submitted to NABARD by Finance Deptt. vide letter No. 472453, Dtd. 25.11.2001. The works under Phase-I of the project is completed.

                   In Phase-II works, comprises excavation of Left Main Canal from 11.355 km to 24.270 km. (Tail), Excavation of Dahiya Distributary from RD 3120m to 4770m and Masinapada Minor from RD 00m to 375m which were under Reserve Forest has been completed during March 2009 and created an additional irrigation potential of 4000 Ha. Hence the irrigation potential of Kantamal Block increased from 27.55% to 42.50% & Boudh from 59.02% to 61.20%. The total up-to-date irrigation  in phase I & II has been given to an ayacut of  6957 Ha. during Kharif 2009-10. Eight nos of Pani Panchayats has been formed for an ayacut of 1850 Ha. New Pani Panchayat will be formed very soon for the balance ayacut of 5107 Ha.

 RIGHT  MAIN  CANAL :-

                The Right Main Canal proposal has been sanctioned by NABARD (RIDF-XVI) for an amount of Rs. 3014.87 lakhs during 2010. and tender invited for 2 Nos. of works amounting to Rs. 332.00 lakhs. L.A. proposal for 51.27 Ha. of 10 Nos. of villages or under 6(i) stage. On completion of Right Main Canal additional 2039 Ha. ayacut area will be create in Boudh Block.

 

COVERAGE OF CULTIVABLE AREA IN BLOCK WISE UNDER IRRIGATION  ( AREA IN HECTOR )

BLOCK

 

TOTAL CULTIVABLE LAND

MEDIUM IRRIGATION
AYACUT AREA

MINOR  IRRIGATION
AYACUT AREA

LIFT  IRRIGATION
AYACUT AREA

OTHERS

TOTAL

TOTAL

EXISTING

PROPOSED

EXISTING

PROPOSED

EXISTING

PROPOSED

EXISTING

PROPOSED

EXISTING

PROPOSED

Boudh

32874.45

15122.49

2597

2693.14

2870

2044

1860

258.92

736.03

20118.55

(61.20 %)

8063.03

( 24.52 % )

28181.58

(85.72 % )

Kantamal

27810

4975.65

 --

3189.52

887

1904

4016

1752.84

1867.21

11822.01

42.50%

6770.21

24.34%

18592.22

66.85%

 

 

 

 

 

 

 

 

 

 

Harabhanga

24728.55

6988.81

 --

5892.44

2100

1916

2120

1241.81

1094.26

16039.06

5314.26

21353.32

 

 

 

 

 

 

 

 

 

 

64.86%

21.49%

86.35%

Total

85413

27086.95

2597

11775.10

5857

5864

7996

3253.57

3697.5

47979.62

20147.5

68127.12

 

 

 

 

 

 

 

 

 

 

56.17%

23.58%

79.76%

ABSTRACT ( FINANCIAL & PHYSICAL )

Year

 

Block

 

Sanctioned  Expenditure incurred Balance  No. of  Completed

 

Balance

 

Amount Expenditure  Online  Amount Works
2007-08 Boudh 1000000 527140 472860 472860 1  -- 1
  Harabhanga 1700000 1648425 1617603 51575 5 5  --
  Total 2700000 2175565 2090463 524435 6 5 1
2008-09 Boudh 4269100 3610834 3062707 658266 27 6 20
  Harabhanga 3965500 3509297 2360669 456203 18 15 3
  Total 8234600 7120131 5423376 1114469 45 21 23
2009-10 Boudh 11417500 3871387 3551973 7546113 21  -- 21
  Harabhanga 5713860 1939766 1176458 3774094 12  -- 12
  Total 17131360 5811153 4728431 11320207 33  -- 33
2010-11 Boudh 3058200  --  -- 3058200 4  -- 4
  Harabhanga 6594500 1180236 278732 5414264 21  -- 21
  Total 9652700 1180236 278732 8472464 25  -- 25

 

Year

Sanctioned 

Amount

Expenditure incurred Balance  No. of  Completed Balance
Expenditure  Online  Amount Works    
2007-08 2700000 2175565 2090463 524435 6 5 1
2008-09 8234600 7120131 6310938 1114469 45 21 23
2009-10 17131360 7605864 5334236 9525496 33  -- 33
2010-11 9652700 1849515 924752 7803185 25  -- 25
Total 37718660 18751075 14660389 18967585 109 26 82

 STATUS REPORT OF MGNREGS WORKS 

Sl. 

No

 

Block

Name of work & work code

Sanction

Amount( in Rs. )

Expenditure incurred

Balance Amount

( in Rs. )

Remarks

Expenditure

On-line entry

2007-08

 

1

Boudh

Imp. to canal service road of LMC from RD 400 to 1000m
2426001/RC-Earthen road /32248

1000000

527140

472860

472860

Progress

 

 

Total

1000000

527140

472860

472860

 

1

Harabhanga

Imp. to service road of Sarsara Disty. Right Bank from RD 500 mtr to 3500 mtr.
2426002/RC metal
1st.coat / 32246

700000

700000

697867

 --

Completed

2

 - do -

Renovation of Salki main canal from RD. 26000 to 28000m. of SIP.    2426002/FP-Desilt/741

400000

367743

363140

32257

 - do -

3

 - do -

Reno. to Balarampur disty. RD. 4000m to 6700m of RMC
2426002/FP-Straight /742

200000

197587

200000

2413

 - do -

4

 - do -

Reno. to Deogarh disty. from RD. 200 to 2300m of RMC 2426002/FP-Straight /743

300000

283095

257189

16905

 - do -

5

 - do -

Reno. to Mathura minor from RD. 500 to 3500m of RMC 2426002/FP-Strructure /744

100000

100000

99407

 --

 - do -

 

 

Total

1700000

1648425

1617603

51575

 

 

 

G. Total

2700000

2175565

2090463

524435

 

2008-09

Sl. 

No

 

Block

Name of work & work code

Sanction

Amount( in Rs. )

Expenditure incurred

Balance Amount

( in Rs. )

Remarks

Expenditure

On-line entry

1

Boudh

Imp. to of LMC from RD. 17060 to 22760m
2426001/FP-Desilting /1219

203000

197100

197100

5900

Completed

2

 - do -

Imp. to Sadeipur disty
2426001/FP-Desilting /1220

51000

50460

50460

540

 - do -

3

 - do -

Imp. to Baunsuni disty 2426001/FP-Desilting /1221

57000

57000

57000

 --

 - do -

4

 - do -

Imp. to Kampada disty
2426001/FP-Desilting /1222

93100

92000

92000

1100

 - do -

5

 - do -

Imp. to Bohira  disty
2426001/FP-Desilting /1223

42000

42000

42000

 --

 - do -

6

 - do -

Imp. to Balakira disty
2426001/FP-Desilting /1224

47000

47000

47000

 --

 - do -

7

 - do -

Imp. to Gobindapur minor  2426001/FP-Desilting /1225

51000

51000

51000

 --

 - do -

8

 - do -

Imp. to of LMC at RD. 900, & 2300 to 2760m
2426001/FP-Desilting /1226

71000

67750

67750

3250

 - do -

9

 - do -

Imp. to Kankala minor
 2426001/FP-Desilting /1227

20000

19850

8840

150

 - do -

10

 - do -

Imp. to Ainalapali S/Minor
2426001/FP-Desilting /1228

25000

25000

14000

 --

 - do -

11

 - do -

Imp. to Kusumjhuli minor  2426001/FP-Desilting /1229

30000

30000

28530

 --

 - do -

12

 - do -

Imp. to of LMC from RD. 8445 to 17060m
2426001/FP-Desilting /1230

220000

220000

216390

 --

 - do -

13

 - do -

Imp. to Barapuduga disty 2426001/FP-Desilting /1231

163000

163000

161860

 --

 - do -

14

 - do -

Imp. to Sahupada disty
2426001/FP-Desilting /1232

41000

41000

40810

 -- 

 - do -

15

 - do -

Imp. to of LMC from RD. 00 to 8445m
2426001/FP-Desilting /1233

364000

295920

293760

68080

Progress

16

 - do -

Imp. to Kantha minor
2426001/FP-Desilting /1234

16000

16000

8030

 --

Completed

17

 - do -

Imp. to Telibandha minor  2426001/FP-Desilting /1235

65000

64100

64100

900

 - do -

18

 - do -

Imp. to Damarugarh minor  2426001/FP-Desilting /1236

41000

41000

40720

 --

 - do -

19

 - do -

Imp. to Jhanapank minor  2426001/FP-Desilting /1237

42000

41500

40500

500

 - do -

20

 - do -

Imp. to Jamaghati minor 2426001/FP-Canal/1289

46000

45990

45990

10

 - do -

21

 - do -

Imp. to Dinmiripali minor 2426001/FP-Canal/1290

38000

38000

38000

 --

 - do -

22

 - do -

Reno. to Dungibandha & imp . to its leading channel at Baunsuni village.
2426001/WC-Tank /67193

984000

479211

479211

504789

Progress

23

Boudh

Imp. to Canal Service road from L/B of Tetelenga S/M  from RD. 300 to 1700m (Tetelenga & Tutusinga)
2426001 / RC-Earth road/54992

320000

280823

219445

39177

Progress

24

 - do -

Imp. to RMC from RD. 00 to 540m
2426001/FP-Desilting /1217

361000

257100

229320

103900

 - do -

25

 - do -

Imp. to Isirisinga disty, Olanda disty. its off-taking 
2426001/FP-Desilting /1218

76000

44440

35200

31560

 - do -

 

 

Total

3467100

2707244

2569016

759856

 

26

Harabhanga

Reno. to RMC from RD. 9370 to 11500m
2426002/FP-Desilting /1251

124000

124000

125712

 --

Completed

27

 - do -

Imp. to Kulimunda disty, from RD.00 to 9200
2426002/FP-Desilting /1252

720000

689240

507390

30760

Progress

28

 - do -

Reno. to Naikapada disty.& Naikapada minor
2426002/FP-Desilting /1254

107000

107000

107000

 --

Completed

29

 - do -

Reno. to RMC from RD. 14000 to 18000m
2426002/FP-Desilting /1265

288000

284890

282909

3110

 - do -

30

 - do -

Reno. to B.N.Pur disty. & B.N. Pur minor
2426002/FP-Desilting /1238

25000

25000

25000

 --

 - do -

31

 - do -

Reno. to Champapur disty. Brundaban minor.
2426002/FP-Desilting /1245

57000

56997

57000

3

 - do -

32

 - do -

Reno. to Pipalkata minor &Landibandha disty.
2426002/FP-Desilting /1246

52000

52000

52000

 --

 - do -

33

 - do -

Reno. to Pankual disty. Badasubalaya minor, Karadi Sub-Minor.
2426002/FP-Desilting /1248

82000

81943

81919

57

 - do -

34

 - do -

Reno. to Biramchandrapur disty. and 12 R minor
2426002/FP-Desilting /1249

40000

40000

40000

 --

 - do -

35

 - do -

Imp.to Sarasara disty,Olanda disty. its off-taking 
2426002/FP-Desilting /1250

284000

284000

125960

 

 - do -

36

 - do -

Reno. to RMC from RD. 24000 to 27000m,
2426002/FP-Desilting /1253

107000

106742

107000

258

 - do -

37

 - do -

Reno. to Nuapada disty. Ghorada minor & Mangalpur minor
2426002/FP-Desilting /1255

46500

46500

46000

 --

 - do -

38

 - do -

Reno. to Bharatpur disty. Barajhuli minor &Sanasubalaya disty.
 2426002/FP-Desilting /1257

90000

89992

90000

8

 - do -

39

 - do -

Reno. to Bethiabereni minor and Bethiabereni Service road.
2426002/FP-Desilting /1258

116000

116000

110444

 --

 - do -

40

 - do -

Reno. to Radhanagar  disty. & Gandhinagar minor
2426002/FP-Desilting /1259

28000

28000

26530

 --

 - do -

41

Harabhanga

Reno. to RMC from RD. 18000 to 24000m
2426002/FP-Desilting /1260

293000

292480

307125

520

Completed

42

 - do -

Reno. to RMC from RD. 11500 to 14000m
2426002/FP-Desilting /1261

145000

143897

143897

1103

 - do -

43

 - do -

Reno. to Balarampur disty. Titirikata minor, Bishnupur minor, S.S.pur minor, Paragalpur minor
2426002/FP-Desilting /1264

160000

157628

133040

2372

 - do -

44

 - do -

Reno. to Deogarh disty. Karunapali minor, Talabhal minor,
2426002/FP-Desilting /1266

53000

52735

52713

265

 - do -

45

 - do -

Reno. to Kelakata tank & Kelakata minor
2426002/WC-tank /61665

1950000

1633843

1320283

316157

Progress

 

 

Total

4767500

4412887

3741922

354613

 

 

 

G. Total

8234600

7120131

6310938

1114469

 

2009-10

1

Harabhanga

Constn. of surplus escape across Gauduninala near village B.Ramchandrapur of SIP.
(2426002/FP-Canal/2043)

3175000

509865

494993

2665135

Progress

2

 - do -

Improvement to Right Main Canal from RD 69370m to 9370m of Salki Irrigation Project.
(2426002/FP-Canal/2567)

478000

393504

268110

84496

 - do -

3

 - do -

Imp. to Sarasara Distributary and its off-taking canal of Right Main Canal of S.I.P.
(2426002/FP-Canal/2570) 

400000

300380

126360

99620

 - do -

4

 - do -

Imp. to Bandhapathara Minor & Gudapada Minor of Kulimunda Disty. of Salki Irrigation Project. (2426002/FP-Canal/2571)

182000

159880

169110

22120

 - do -

5

 - do -

Imp. to Birnarsingpur Disty of Salki Irrigation Project. (2426002/FP-Canal/2572)

99700

86270

78840

13430

 - do -

6

 - do -

Imp. to Bishnupur Minor of Salki Irrigation Project.
(2426002/FP-Canal/2573)

250000

53396

51840

196604

 - do -

7

 - do -

Imp. to Bharatpur Disty. from RD 2000m to 4126m of Salki Irrigation Project.
 (2426002/FP-Canal/2574)

250000

100464

101520

149536

 - do -

8

 - do -

Imp. to Radhanagar Disty. of Salki Irrigation Project. (2426002/FP-Canal/2575)

249900

155872

88560

94028

 - do -

9

 - do -

Imp. to Mathura Minor of Salki Irrigation Project.
 (2426002/FP-Canal/2576)

200000

66036

64800

133964

 - do -

10

 - do -

Imp. to Kelakata Minor & Brundaban Minor of S.I.P. (2426002/FP-Canal/2577)

99960

93877

49680

6083

 - do -

11

 - do -

Imp. to Landibandha Disty. from RD 00 to 4500m of Salki Irrigation Project.
(2426002/FP-Canal/2578)

229300

97324

35640

131976

 - do -

12

 - do -

Imp. to Raghunathpur Minor of Salki Irrigation Project. (2426002/FP-Canal/2580)

100000

94136

88560

5864

 - do -

13

 - do -

Imp. to Kulimunda disty.& its off-taking canal from RD. 4176 to 9200m
2426001/FP-Canal /2167

319000

191083

268877

127917

 - do -

 

 

Total

6032860

2302087

1886890

3730773

 

14

Boudh

Bank protection to Tetelenga Sub-Minor from RD 1710m to 2411m to 2883m of Salki Irrigation Project.
(2426002/FP-Canal/2581)

2570000

1725936

980696

844064

Progress

15

 - do -

Imp. to RMC from RD 00m to 540m of Salki Irrigation Project.
(2426001/FP-Canal/2582)

300000

223104

195480

76896

 - do -

16

 - do -

Imp. to Issirisinga Disty. & Olanda Disty. & its off-taking canal of S.I.P.
 (2426001/FP-Canal/2584)

203000

49232

25020

153768

 - do -

17

 - do -

Imp. to Kulimunda Disty. & its off-taking canal in between RD 4300m to 9200m of Salki Irrigation Project.
(2426001/FP-Canal/2585)

598000

518338

460080

79662

 - do -

18

 - do -

Imp. to Govindpur Minor of Salki Irrigation Project.
 (2426001/FP-Canal/2586)

583000

407820

227842

175180

 - do -

19

 - do -

Imp. to Gudapada Disty. & Bastampur Disty of Salki Irrigation Project.
 (2426001/FP-Canal/2587)

200000

119970

103230

80030

 - do -

20

 - do -

Imp. to Tulasipur Disty., Palaspat, Mundipadar & Sangrampur Minor of Salki Irrigation Project.
 (2426001/FP-Canal/2588)

200000

27360

40320

172640

 - do -

21

 - do -

Imp. to Ainlapali Minor & Dantapali Minor of Salki Irrigation Project.
(2426001/FP-Canal/2589)

200000

75420

76590

124580

 - do -

22

 - do -

Imp. to LMC from RD 22000m to 24000m of Salki Irrigation Project.
 (2426001/FP-Canal/2590)

200000

102660

101340

97340

 - do -

23

 - do -

Imp. to Bohira Disty. of Salki Irrigation Project.
(2426001/FP-Canal/2591)

200000

125592

125592

74408

 - do -

24

 - do -

Imp. to Baunsuni Disty. & Jalai Disty of Salki Irrigation Project.
(2426001/FP-Canal/2592)

200000

125640

103680

74360

 - do -

25

 - do -

Imp. to Damurugarh Minor & Kankala Minor of Salki Irrigation Project.
(2426001/FP-Canal/2593)

200000

108000

108000

92000

 - do -

26

 - do -

Improvement to Kantha Rajabandha of Ainlapali Minor of Salki Irrigation Project.
(2426001/FP-Others/2611)

1057000

583816

265257

473184

 - do -

27

Boudh

Imp. to Dungibandha field channel of Baunsuni village of Salki Irrigation Project.
 (2426001/FP-Others/2612)

915600

 

 --

915600

Progress

28

 - do -

Imp. to Left Main Canal from RD 22700m to 23300m of Baunsuni village of SI.P.
 (2426001/FP-Canal/2613)

1090000

364472

121725

725528

 - do -

29

 - do -

Renovation of causeway & canal embankment of LMC near RD 14600m of Salki Irrigation Project.
(2426001/FP-Canal/2614)

980700

139249

124204

841451

 - do -

30

 - do -

Imp. to Balakira Distributary, service rod & canal bank of Salki Irrigation Project.
(2426001/FP-Canal/2615)

303000

110930

49820

192070

 - do -

31

 - do -

Imp. to Tulasipur Disty. of Salki Irrigation Project.
(2426001/FP-Canal/2616)

179000

19980

19080

159020

 - do -

32

 - do -

Imp. to Damurugarh Minor of Salki Irrigation Project.
(2426001/FP-Canal/2617)

283700

167956

136517

115744

 - do -

33

 - do -

Imp. to Kamalpur Irrigation Office Tank & Approach Road of S.I.P.
(2426001/FP-Canal/2618)

635500

308302

182873

327198

 - do -

 

 

Total

11098500

5303777

3447346

5794723

 

 

 

G. Total

17131360

7605864

5334236

9525496

 

2010-11

1

Boudh

Imp. to Right Main Canal from RD 3690m to 5910m of Salki Irrigation Project.
(2426001/FP/Canal/2583)

634400

 --

 --

634400

Progress

2

 - do -

Improvement to Left Main Canal from RD 18600m to 22000m of Salki Irrigation Project.
(2426001/FP-Canal/2996)

481700

 --

 --

481700

 - do -

3

 - do -

Imp. to L.M.C. from RD 8445m to 13320m of S.I.P.
(2426001/FP-Canal/2997)

1087700

 --

 --

1087700

 - do -

4

 - do -

Imp. to L.M.C. from RD 13320m to 18600m of S.I.P.
(2426001/FP-Canal/2998)

854400

 --

 --

854400

 - do -

 

 

Total

3058200

 --

 --

3058200

 

5

Harabhanga

Imp. to Kulimunda Disty. from RD 00 to 4.300 km of Salki Irrigation Project.
(2426002/FP-Canal/2568)

424000

58320

 --

365680

 - do -

6

 - do -

Imp. to R.M.C. from RD 25353m to 28000m of Salki Irrigation Project.
(2426002/FP-Canal/2579)

234000

127440

42120

106560

 - do -

7

 - do -

Reno. to R.M..C from RD 20500m to 24300m of Salki Irrigation Project
(2426002/FP-Canal/2999)

307300

113580

 --

193720

 - do -

8

 - do -

Reno. to Naikpada Disty. & Nanikpada Mnior of Salki Irrigation Project
(2426002/FP-Canal/3000)

471900

121116

59400

350784

 - do -

9

 - do -

Imp. to Naikpada Distributary from RD 2052m to 2272m of S.I.P.
(2426002/FP-Canal/3001)

513200

132688

 --

380512

 - do -

10

 - do -

Reno. to R.M.C. from RD 9370m to 10600m of Salki Irrigation Project
(2426002/FP-Canal/3002)

170500

139500

 --

31000

 - do -

11

 - do -

Reno. to B.N. Pur, B. Ch. Pur Disty. , 33L Mnior of Salki Irrigation Project
(2426002/FP-Canal/3003)

311200

62952

57240

248248

 - do -

12

 - do -

Reno. to Pankual Disty., Badasu-balaya  & Karadi Mnior of S.I.P.
(2426002/FP-Canal/3004)

337700

73620

65880

264080

 - do -

13

 - do -

Reno. to R.M..C from RD 24300m to 25300m of S.I.P.
(2426002/FP-Canal/3005)

78400

 

 --

78400

 - do -

14

 - do -

Reno. to Nuapada Disty., Ghorada, Mangalpur Minor of Salki Irrigation Project
(2426002/FP-Canal/3006)

392000

20636

17820

371364

 - do -

15

Harabhanga

Renovation of Deogarh Disty., Talbahal Minor of S.I.P.
(2426002/FP-Canal/3007)

221400

112362

121680

109038

Progress

16

 - do -

Reno. of R.M.C. from RD 10600m to 12800m of S.I.P.
(2426002/FP-Canal/3008)

249200

 

 --

249200

 - do -

17

 - do -

Reno. to R.M..C from RD 18500m to 20500m of Salki Irrigation Project
(2426002/FP-Canal/3009)

270400

103680

100440

166720

 - do -

18

 - do -

Reno. to R.M..C from RD 17000m to 18500m of Salki Irrigation Project
(2426002/FP-Canal/3010)

306500

 

 --

306500

 - do -

19

 - do -

Reno. of R.M.C. from RD 12800m to 15000m of S.I.P.
(2426002/FP-Canal/3011)

244700

 

 --

244700

 - do -

20

 - do -

Reno. to Naikpada Disty. & Bethiabereni Minor of S.I.P.
(2426002/FP-Canal/3012)

203400

114636

110160

88764

 - do -

21

 - do -

Reno. to R.M..C from RD 16000m to 17000m of Salki Irrigation Project
(2426002/FP-Canal/3013)

136900

77760

 --

59140

 - do -

22

 - do -

Reno. to Balarampur Disty. , S.S. Pur, Pargalpur Minor & 11L Minor of S.I.P.
(2426002/FP-Canal/3014)

322200

67616

 --

254584

 - do -

23

 - do -

Reno. to Sansubalaya Disty. , Bargha Minor of S.I.P.
(2426002/FP-Canal/3015)

436800

81656

71280

355144

 - do -

24

 - do -

Reno. to Naikpada Disty. from RD 00m to 213m of Salki Irrigation Project.
(2426002/FP-Canal/3016)

468500

412374

278732

56126

 - do -

25

 - do -

Imp. to service road of Landibandha Disty. of left bank of Salki Irrigation Project
(2426002/FP-Canal/3017)

494300

29579

 --

464721

 - do -

 

 

Total

6594500

1849515

924752

4744985

 

 

 

G. Total

9652700

1849515

924752

7803185

 

 

 

Top

LIFT  IRRIGATION

BLOCKWISE   EXISTING LIPS & ACHIEVEMENT 2010-11  (TO BE OPERATED BY PANI PANCHAYATS)

 

 

 

 

 

 

 

Sl.

No

 

 

 

 

 

 

 

Name of the Block

Total existing LIPs

Nos. of LIPs handed over to PPs

 Nos of Defunct Lift Irrigation Projects.

Nos. of LIPs operated and area irrigated

 Nos

Designed Ayacut (in Ha.)

 Nos

 Designed Ayacut (in Ha.)

Nos of Temporary Defunct LIPs with OLIC

Nos of Temporary Defunct LIPs with pani panchayat

Nos of Temporary Defunct LIPs with OLIC

 Total

Nos. of LIPs programmed for Rabi 2010-11

 

Nos

 

Designed Ayacut (in Ha.)

 

Nos

 

Designed Ayacut (in Ha.)

 

Nos

 

Designed Ayacut (in Ha.)

 

Nos

 

Designed Ayacut (in Ha.)

 

Nos

 

Designed Ayacut (in Ha.)

 

Programmed Ayacut (in Ha.)

 

Nos

 

Area in Ha.

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

1

Boudh

101

2568

101

2568

-

-

16

356

0

0

16

356

85

2212

1704

61

870

2

Harabhanga

105

2784

99

2564

-

-

34

788

6

220

40

1008

65

1776

1294

50

710

3

Kantamal

130

3494

130

3494

-

-

2

40

0

0

2

40

128

3454

2550

93

1234

 

Total

336

8846

330

8626

-

-

52

1184

6

220

58

1404

278

7442

5548

204

2814

INSTALLATION OF NEW O.L.I.C. PROJECTS  OUT OF B.K.V.Y. GRANT 2009-10
 (SANCTIONED IN XI & XII SLSC) (RIDF TRANCHE-XV) UNDER L.I. SUB-DIVISION, BOUDH 

Sl. No Name of the Block No. of Lift  Irrigation Projects sanctioned No. of LIPs  dropped No. of  LIPs  was  taken up Ayacut area to be covered in Ha. Year of funding Total estimated  cost 20% W.U.A. Share Amount sanctioned  (80%) of Estimated cost for Non-KVK District funds release Expenditure incurred U.C. Submitted Balance U.C. to be submittd Physical Achievement Remarks 
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Boudh 5 Nil 5 120 2009-10 48.55482 9.71097 38.84385 38.84000 Nil Nil 38.84000 works in progress   
2 Harabhanga 8 Nil 8 192 2009-10 79.52862 15.90572 63.62290 63.62290 Nil Nil 63.62290 works in progress   
3 Kantamal 14 Nil 14 336 2009-10 149.07000 29.81400 119.25600 119.25600 Nil Nil 119.25600 works in progress   
  Total  27 Nil 27 648   277.15344 55.43069 221.72275 221.72275 Nil Nil 221.72275    

INSTALLATION OF NEW O.L.I.C. PROJECTS   OUT OF B.K.V.Y. GRANT-2009-10
 UNDER L.I. SUB-DIVISION, BOUDH (SANCTIONED IN THE XII SLSC)

Sl.No Name of  the Block No. of Lift  Irrigation Projects sanctioned No. of  LIPs dropped No. of LIPs was taken up Ayacut  area top be covered in Ha. Year of  funding Total estimated cost 20% W.U.A.  share  Amount sanctioned (80%) of Estimated Cost for Non- KVK District Funds releasd  expenditure  incurred U.C. submitted Balance U.C.  to be submitted Physical Achievment  Remarks 
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Harabhanga 5 Nil Nil 120 2010-11 49.11 9.8 39.26 39.29 Nil Nil 39.29 work in  progress  work in  progress 
2 Kantamal 4 Nil Nil 96 2010-11 38.63 7.73 30.9 30.9 Nil Nil 30.9 work in  progress  work in  progress 
  Total 9 Nil Nil 216   87.74 17.55 70.19 70.19 Nil Nil 70.19 work in  progress  work in  progress 

 

REVIVAL OF DEUCNCT OLIC PROJECTS (29 NOS) OUT OF B.K.V.Y. GRANT 2010-11

 (SANCTIONED IN XII SLSC DURING THE YEAR 2008-09)

Year of funding - 2010-11

Sl.No. Name of the Block No.of L.I. projects to be revived Ayacut area in Ha. Total estimated cost in Rs. Lakhs  20% W.U.A. Share 80% of Estimated cost for Non-KVK Districft Release of funds  Remarks
1 2 3 4 5 6 7 8 9
1 Boudh 5 112 29.839 5.967 23.872 23.872 Works in progress 
2 Harabhanga  24 480 171.136 34.227 136.909 136.909 Works in progress 
  Total  29 592 200.975 40.194 160.781 160.781 Works in progress 

PROPOSED LIFT IRRIGATION PROJECTS TO BE TAKEN UP UNDER BIJU KRUSHAK VIKASH YOJANA
(B.K.V.Y-XIV SLSC) FOR NABARD FUNDING DURING THE FINANCIAL YEAR 2010-11.

Sl.No. Name of the Block  No.of  Lift irrigation projects to be taken up Ayacur area to be covered in Ha Total estimated  cost in Rs.Lakhs 20% W.U.A.  share 80% of  Estimated cost for Non KVK district Remarks 
1 2 3 4 5 6 7 8
1 Boudh 81 1944 972 194.4 777.6 Plan & estimates of these L.I.Ps  have been submitted to the Addl. Secretary ,Water Resources Deptt. Govt. of Orissa, Bhubaneswar vide Lr.No. 629(WE) dtd. 6.09.10 of the Collector, Boudh
2 Harabhanga  54 1296 648 129.6 518.4
3 Kantamal  75 1800 900 180 720
  Total 210 5040 2520 504 2016  

 

REVIVAL/ REPAIR / RESTORATION OF INOPERABLE O. L.C

OUT OF  S.R.C GRANT' 2010-11 (DROUGHT GRANT '2010-11)

                                                                                                                                              Rs. In lakhs

 

Sl.No Name of  the Block Nos of OLIC projects involved Ayacut area in Hact. Estimated cost in Rs. Lakh Sanctioned amount in Rs. Lakh Amount released from Dist. Admn. Expenditure incurred U/C submitted Balance U/C  to be submitted  Present status of the projects
1 2 3 4 5 6 7 8 9 10 11
1 Boudh 47 996 20.78 20.78 20.78 14.41215 14.41215 6.36785 Works in  progress
2 Harabhanga 27 732 13.83 13.83 13.83 10.30095 10.30095 3.52905 Works in  progress
3 Kantamal 25 636 15.39 15.39 15.39 5.88863 5.88863 9.50137 Works in  progress
  Total  99 2364 50 50 50 30.60173 30.60173 19.39827  

 

REPAIR/REVIVAL OF 05 NOS O.L.I.C. PROJECTS   OUT OF S.R.C.
GRANT 2010-11 RECIVED THROUGH HEAD OFFICE O.L.I.C., BHUBANESWAR.

Sl.No Name of the Block Nos of OLIC projects involved Ayacut area in Hact. Estimated cost in Rs. Lakh Sanctioned amount in Rs Lakh Amount released from Dist. Admn. Expenditure incurred U/C submitted Balance U/c to be submitted Present status of the projects
1 2 3 4 5 6 7 8 9 10 11
1 Boudh 3 68 3.55 3.55 3.55 Nil Nil 3.55 Works in progress
2 Harabhanga 1 40 2.82 2.82 2.82 Nil Nil 2.82 Works in progress
3 Kantamal 1 20128 1.4 1.4 1.4 Nil Nil 1.4 Works in progress
  Total  5 20236 7.77 7.77 7.77 Nil Nil 7.77  

REPAIR/RESTORATION OF O.L.I.C. PROJECTS OUT OF F.D.R. 2008 GRANT (5TH PHASE)
(FUNDS WAS RELEASED DURING 2010-11)

Sl.No Name of the Block Nos of OLIC projecs involved Ayacut area in Hact. Estimated cost in Rs. Lakh Sanctioned amount in Rs Lakh Amount releasd from Dist. Admn. Expenditure incurred U/C submitted Balance U/c to be submitted Present status of the projects
1 2 3 4 5 6 7 8 9 10 11
1 Boudh 8 160 23.67 23.67 23.67 Nil Nil 23.67 Works in progress
2 Harabhanga 3 60 5.75 5.75 5.75 Nil Nil 5.75 Works in progress
3 Kantamal 1 20 4.73 4.73 4.73 Nil Nil 4.73 Works in progress
  Total  12 240 34.15 34.15 34.15 Nil Nil 34.15  

INSTALLATION OF NEW O.L.I.C. PROJECTS  OUT OF W.O.D.C. GRANT UNDER L.I. SUB-DIVISION, BOUDH

Sl.No Name of the Block No.of Lift Irrigation Projects sanctioned Ayaut area to be covered in Ha. Year of funding Total estimated cost in Rs. Lakhs Amount sanctioned in Rs. Lakhs Amount released in Rs. Lakhs Balance amount to be released in Rs. Lakhs Expenditure incurred  & U.C. submitted in Rs. Lakhs Project Status Remarks 
1 2 3 4 5 6 7 8 9 10 11 12
1 Harabhanga Maulsinga-II 20 2010-11 15.00 15.00 13.00 2.00 Nil Works in progress  
2 Kantamal Deulidunguri-II 20 2010-11</