Boudh Irrigation Division is having jurisdiction of Irrigation activities of Boudh and Kandhamal Districts. The Irrigation activities in Boudh District is as follows.
i. Maintenance of Salki Irrigation Project
ii. Construction of Bagh Barrage Project.
1.SALKI IRRIGATION PROJECT :
This is a diversion weir scheme constructed across river Salki near village Paljhar about 20 Km from Boudh town. The project was completed in the year 1972 at the capital cost of Rs. 250 lakhs. It is designed to provide irrigation to 19891 Ha. in Khariff and 1000 Ha. in Rabi in 252 villages in Boudh and Harbhanga Blocks of Boudh District. Salki Irrigation Project is a largest diversion weir Project in Orissa having a catchment area of 1638 Sq. Kms., constructed across river Salki near village Paljhar about 20 Km. from Boudh Town. River Salki is a longest tributary of river Mahanadi which originates from eastern ghat rangers (Baliguda range) and after traversing hilly areas it confluence with river Mahanadi about 8 Km. from west of Boudh town.
This Project was taken of during the year 1960 at an estimated cost of 52.85 lakh and has completed on 1972 at a cost of 225.75 lakh. It is designed to provide irrigation 19891 Ha. in Kharif and 1000 Ha. in Rabi. The Project contemplated with two canal systems namely Right Main Canal and Left Main Canal having an ayacut area of 10556 Ha. and 9335 Ha. respectively. The Right Main Canal is 28 Km. long and a network of 138.21 Km of distribution system and design discharge of 10.76 cumecs. The Left Main Canal is 24 Km. long with 107 Km. of distribution system with a design discharge of 10.33 cumecs. This is the most successful irrigation Project which irrigates 19891 Ha. of ayacut in drought affected areas of Boudh and Harbhanga Block in Boudh district for last 37 years.
36 Nos. of Pani Panchayats with five Distributary committee and one Apex Committee has been formed as per Pani Panchayat Act for smooth management and distribution of water supply for 19891 Ha. ayacut in 216 nos. of villages of Boudh District.
Flood Protection Works (Mahanadi River) :-
Boudh Town and most of village of Boudh District situated on the right side of the river Mahanadi some part of Boudh Twon get flooded during high flood. Hence to protect Boudh Town an estimate amounting to Rs. 1458.76 lakhs has been approved by 11th TAC. The work has sanctioned by NABARD and tender invited on March 2011.
During this year 26 Nos. of works for Rs. 110.00 lakhs has takenup and completed.
12th Finance
3 Nos. of works for Rs. 15.00 lakhs has takenup and completed.
2.BAGH BARRAGE PROJECT :
The Bagh Barrage Medium Irrigation Project has been taken-up in November 1997 under NABARD assistance. The Project is being constructed across river Bagh at Sagada. The original cost estimated Rs. 4471 lakhs went an upward revision of Rs. 7564 lakhs and was due to the change in designs and enhanced cost of materials and labour. The project on completion as a whole will provide irrigation to 9660 Ha in Boudh and Kantamal Blocks of Boudh District.
Bagh Barrage Project envisages with construction of barrage of length 167 meters with vertically lifted gates across river Bagh near village Sagada of Boudh District and excavation of Left Main Canal of 24.27 Km. and its distribution system to achieve an ayacut of 9660 Ha. The location of barrage site is at village Sagada 200 N 39’00 / 840 Eoo’02”. The revised cost of the Project is Rs. 7564.89 lakhs.
The project was proposed to take up under NABARD Assistance in phased manner. The Phase-I of the project has already been sanctioned by NABARD for Rs. 1915.04 lakhs ( NABARD share Rs. 1817.00 lakhs and State’s share Rs. 98.04 lakhs ). Later on, the cost of Phase-I has been revised to Rs. 3253.21 lakhs for which estimates have already been submitted to NABARD by Finance Deptt. vide letter No. 472453, Dtd. 25.11.2001. The works under Phase-I of the project is completed.
In Phase-II works, comprises excavation of Left Main Canal from 11.355 km to 24.270 km. (Tail), Excavation of Dahiya Distributary from RD 3120m to 4770m and Masinapada Minor from RD 00m to 375m which were under Reserve Forest has been completed during March 2009 and created an additional irrigation potential of 4000 Ha. Hence the irrigation potential of Kantamal Block increased from 27.55% to 42.50% & Boudh from 59.02% to 61.20%. The total up-to-date irrigation in phase I & II has been given to an ayacut of 6957 Ha. during Kharif 2009-10. Eight nos of Pani Panchayats has been formed for an ayacut of 1850 Ha. New Pani Panchayat will be formed very soon for the balance ayacut of 5107 Ha.
RIGHT MAIN CANAL :-
The Right Main Canal proposal has been sanctioned by NABARD (RIDF-XVI) for an amount of Rs. 3014.87 lakhs during 2010. and tender invited for 2 Nos. of works amounting to Rs. 332.00 lakhs. L.A. proposal for 51.27 Ha. of 10 Nos. of villages or under 6(i) stage. On completion of Right Main Canal additional 2039 Ha. ayacut area will be create in Boudh Block.
COVERAGE OF CULTIVABLE AREA IN BLOCK WISE UNDER IRRIGATION ( AREA IN HECTOR )
|
BLOCK
|
TOTAL CULTIVABLE LAND |
MEDIUM IRRIGATION |
MINOR IRRIGATION |
LIFT IRRIGATION |
OTHERS |
TOTAL |
TOTAL |
|||||
|
EXISTING |
PROPOSED |
EXISTING |
PROPOSED |
EXISTING |
PROPOSED |
EXISTING |
PROPOSED |
EXISTING |
PROPOSED |
|||
|
Boudh |
32874.45 |
15122.49 |
2597 |
2693.14 |
2870 |
2044 |
1860 |
258.92 |
736.03 |
20118.55 (61.20 %) |
8063.03 ( 24.52 % ) |
28181.58 (85.72 % ) |
|
Kantamal |
27810 |
4975.65 |
-- |
3189.52 |
887 |
1904 |
4016 |
1752.84 |
1867.21 |
11822.01 42.50% |
6770.21 24.34% |
18592.22 66.85% |
|
|
|
|
|
|
|
|
|
|
|
|||
|
Harabhanga |
24728.55 |
6988.81 |
-- |
5892.44 |
2100 |
1916 |
2120 |
1241.81 |
1094.26 |
16039.06 |
5314.26 |
21353.32 |
|
|
|
|
|
|
|
|
|
|
|
64.86% |
21.49% |
86.35% |
|
Total |
85413 |
27086.95 |
2597 |
11775.10 |
5857 |
5864 |
7996 |
3253.57 |
3697.5 |
47979.62 |
20147.5 |
68127.12 |
|
|
|
|
|
|
|
|
|
|
|
56.17% |
23.58% |
79.76% |
ABSTRACT ( FINANCIAL & PHYSICAL )
|
Year
|
Block
|
Sanctioned | Expenditure incurred | Balance | No. of |
Completed
|
Balance
|
|
| Amount | Expenditure | Online | Amount | Works | ||||
| 2007-08 | Boudh | 1000000 | 527140 | 472860 | 472860 | 1 | -- | 1 |
| Harabhanga | 1700000 | 1648425 | 1617603 | 51575 | 5 | 5 | -- | |
| Total | 2700000 | 2175565 | 2090463 | 524435 | 6 | 5 | 1 | |
| 2008-09 | Boudh | 4269100 | 3610834 | 3062707 | 658266 | 27 | 6 | 20 |
| Harabhanga | 3965500 | 3509297 | 2360669 | 456203 | 18 | 15 | 3 | |
| Total | 8234600 | 7120131 | 5423376 | 1114469 | 45 | 21 | 23 | |
| 2009-10 | Boudh | 11417500 | 3871387 | 3551973 | 7546113 | 21 | -- | 21 |
| Harabhanga | 5713860 | 1939766 | 1176458 | 3774094 | 12 | -- | 12 | |
| Total | 17131360 | 5811153 | 4728431 | 11320207 | 33 | -- | 33 | |
| 2010-11 | Boudh | 3058200 | -- | -- | 3058200 | 4 | -- | 4 |
| Harabhanga | 6594500 | 1180236 | 278732 | 5414264 | 21 | -- | 21 | |
| Total | 9652700 | 1180236 | 278732 | 8472464 | 25 | -- | 25 | |
| Year |
Sanctioned Amount |
Expenditure incurred | Balance | No. of | Completed | Balance | |
| Expenditure | Online | Amount | Works | ||||
| 2007-08 | 2700000 | 2175565 | 2090463 | 524435 | 6 | 5 | 1 |
| 2008-09 | 8234600 | 7120131 | 6310938 | 1114469 | 45 | 21 | 23 |
| 2009-10 | 17131360 | 7605864 | 5334236 | 9525496 | 33 | -- | 33 |
| 2010-11 | 9652700 | 1849515 | 924752 | 7803185 | 25 | -- | 25 |
| Total | 37718660 | 18751075 | 14660389 | 18967585 | 109 | 26 | 82 |
STATUS REPORT OF MGNREGS WORKS
|
Sl. No
|
Block |
Name of work & work code |
Sanction Amount( in Rs. ) |
Expenditure incurred |
Balance Amount ( in Rs. ) |
Remarks |
|
|
Expenditure |
On-line entry |
||||||
2007-08
|
1 |
Boudh |
Imp. to canal service road of LMC from RD 400 to 1000m |
1000000 |
527140 |
472860 |
472860 |
Progress |
|
|
|
Total |
1000000 |
527140 |
472860 |
472860 |
|
|
1 |
Harabhanga |
Imp. to service road of Sarsara Disty. Right Bank from RD 500 mtr to 3500
mtr. |
700000 |
700000 |
697867 |
-- |
Completed |
|
2 |
- do - |
Renovation of Salki main canal from RD. 26000 to 28000m. of SIP. 2426002/FP-Desilt/741 |
400000 |
367743 |
363140 |
32257 |
- do - |
|
3 |
- do - |
Reno. to Balarampur disty. RD. 4000m to 6700m of RMC |
200000 |
197587 |
200000 |
2413 |
- do - |
|
4 |
- do - |
Reno. to Deogarh disty. from RD. 200 to 2300m of RMC 2426002/FP-Straight /743 |
300000 |
283095 |
257189 |
16905 |
- do - |
|
5 |
- do - |
Reno. to Mathura minor from RD. 500 to 3500m of RMC 2426002/FP-Strructure /744 |
100000 |
100000 |
99407 |
-- |
- do - |
|
|
|
Total |
1700000 |
1648425 |
1617603 |
51575 |
|
|
|
|
G. Total |
2700000 |
2175565 |
2090463 |
524435 |
|
2008-09
|
Sl. No
|
Block |
Name of work & work code |
Sanction Amount( in Rs. ) |
Expenditure incurred |
Balance Amount ( in Rs. ) |
Remarks |
|
|
Expenditure |
On-line entry |
||||||
|
1 |
Boudh |
Imp. to of LMC from RD. 17060 to 22760m |
203000 |
197100 |
197100 |
5900 |
Completed |
|
2 |
- do - |
Imp. to Sadeipur disty |
51000 |
50460 |
50460 |
540 |
- do - |
|
3 |
- do - |
Imp. to Baunsuni disty 2426001/FP-Desilting /1221 |
57000 |
57000 |
57000 |
-- |
- do - |
|
4 |
- do - |
Imp. to Kampada disty |
93100 |
92000 |
92000 |
1100 |
- do - |
|
5 |
- do - |
Imp. to Bohira disty |
42000 |
42000 |
42000 |
-- |
- do - |
|
6 |
- do - |
Imp. to Balakira disty |
47000 |
47000 |
47000 |
-- |
- do - |
|
7 |
- do - |
Imp. to Gobindapur minor 2426001/FP-Desilting /1225 |
51000 |
51000 |
51000 |
-- |
- do - |
|
8 |
- do - |
Imp. to of LMC at RD. 900, & 2300 to 2760m |
71000 |
67750 |
67750 |
3250 |
- do - |
|
9 |
- do - |
Imp. to Kankala minor |
20000 |
19850 |
8840 |
150 |
- do - |
|
10 |
- do - |
Imp. to Ainalapali S/Minor |
25000 |
25000 |
14000 |
-- |
- do - |
|
11 |
- do - |
Imp. to Kusumjhuli minor 2426001/FP-Desilting /1229 |
30000 |
30000 |
28530 |
-- |
- do - |
|
12 |
- do - |
Imp. to of LMC from RD. 8445 to 17060m |
220000 |
220000 |
216390 |
-- |
- do - |
|
13 |
- do - |
Imp. to Barapuduga disty 2426001/FP-Desilting /1231 |
163000 |
163000 |
161860 |
-- |
- do - |
|
14 |
- do - |
Imp. to Sahupada disty |
41000 |
41000 |
40810 |
-- |
- do - |
|
15 |
- do - |
Imp. to of LMC from RD. 00 to 8445m |
364000 |
295920 |
293760 |
68080 |
Progress |
|
16 |
- do - |
Imp. to Kantha minor |
16000 |
16000 |
8030 |
-- |
Completed |
|
17 |
- do - |
Imp. to Telibandha minor 2426001/FP-Desilting /1235 |
65000 |
64100 |
64100 |
900 |
- do - |
|
18 |
- do - |
Imp. to Damarugarh minor 2426001/FP-Desilting /1236 |
41000 |
41000 |
40720 |
-- |
- do - |
|
19 |
- do - |
Imp. to Jhanapank minor 2426001/FP-Desilting /1237 |
42000 |
41500 |
40500 |
500 |
- do - |
|
20 |
- do - |
Imp. to Jamaghati minor 2426001/FP-Canal/1289 |
46000 |
45990 |
45990 |
10 |
- do - |
|
21 |
- do - |
Imp. to Dinmiripali minor 2426001/FP-Canal/1290 |
38000 |
38000 |
38000 |
-- |
- do - |
|
22 |
- do - |
Reno. to Dungibandha & imp . to its leading channel at
Baunsuni village. |
984000 |
479211 |
479211 |
504789 |
Progress |
|
23 |
Boudh |
Imp. to Canal Service road from L/B of Tetelenga S/M
from RD. 300 to 1700m (Tetelenga & Tutusinga) |
320000 |
280823 |
219445 |
39177 |
Progress |
|
24 |
- do - |
Imp. to RMC from RD. 00 to 540m |
361000 |
257100 |
229320 |
103900 |
- do - |
|
25 |
- do - |
Imp. to Isirisinga disty, Olanda disty. its
off-taking |
76000 |
44440 |
35200 |
31560 |
- do - |
|
|
|
Total |
3467100 |
2707244 |
2569016 |
759856 |
|
|
26 |
Harabhanga |
Reno. to RMC from RD. 9370 to 11500m |
124000 |
124000 |
125712 |
-- |
Completed |
|
27 |
- do - |
Imp. to Kulimunda disty, from RD.00 to 9200 |
720000 |
689240 |
507390 |
30760 |
Progress |
|
28 |
- do - |
Reno. to Naikapada disty.& Naikapada minor |
107000 |
107000 |
107000 |
-- |
Completed |
|
29 |
- do - |
Reno. to RMC from RD. 14000 to 18000m |
288000 |
284890 |
282909 |
3110 |
- do - |
|
30 |
- do - |
Reno. to B.N.Pur disty. & B.N. Pur minor |
25000 |
25000 |
25000 |
-- |
- do - |
|
31 |
- do - |
Reno. to Champapur disty. Brundaban minor. |
57000 |
56997 |
57000 |
3 |
- do - |
|
32 |
- do - |
Reno. to Pipalkata minor &Landibandha disty. |
52000 |
52000 |
52000 |
-- |
- do - |
|
33 |
- do - |
Reno. to Pankual disty. Badasubalaya minor, Karadi
Sub-Minor. |
82000 |
81943 |
81919 |
57 |
- do - |
|
34 |
- do - |
Reno. to Biramchandrapur disty. and 12 R minor |
40000 |
40000 |
40000 |
-- |
- do - |
|
35 |
- do - |
Imp.to Sarasara disty,Olanda disty. its off-taking
|
284000 |
284000 |
125960 |
|
- do - |
|
36 |
- do - |
Reno. to RMC from RD. 24000 to 27000m, |
107000 |
106742 |
107000 |
258 |
- do - |
|
37 |
- do - |
Reno. to Nuapada disty. Ghorada minor & Mangalpur
minor |
46500 |
46500 |
46000 |
-- |
- do - |
|
38 |
- do - |
Reno. to Bharatpur disty. Barajhuli minor &Sanasubalaya
disty. |
90000 |
89992 |
90000 |
8 |
- do - |
|
39 |
- do - |
Reno. to Bethiabereni minor and Bethiabereni Service
road. |
116000 |
116000 |
110444 |
-- |
- do - |
|
40 |
- do - |
Reno. to Radhanagar disty. & Gandhinagar minor |
28000 |
28000 |
26530 |
-- |
- do - |
|
41 |
Harabhanga |
Reno. to RMC from RD. 18000 to 24000m |
293000 |
292480 |
307125 |
520 |
Completed |
|
42 |
- do - |
Reno. to RMC from RD. 11500 to 14000m |
145000 |
143897 |
143897 |
1103 |
- do - |
|
43 |
- do - |
Reno. to Balarampur disty. Titirikata minor, Bishnupur
minor, S.S.pur minor, Paragalpur minor |
160000 |
157628 |
133040 |
2372 |
- do - |
|
44 |
- do - |
Reno. to Deogarh disty. Karunapali minor, Talabhal
minor, |
53000 |
52735 |
52713 |
265 |
- do - |
|
45 |
- do - |
Reno. to Kelakata tank & Kelakata minor |
1950000 |
1633843 |
1320283 |
316157 |
Progress |
|
|
|
Total |
4767500 |
4412887 |
3741922 |
354613 |
|
|
|
|
G. Total |
8234600 |
7120131 |
6310938 |
1114469 |
|
2009-10
|
1 |
Harabhanga |
Constn. of surplus escape across Gauduninala near
village B.Ramchandrapur of SIP. |
3175000 |
509865 |
494993 |
2665135 |
Progress |
|
2 |
- do - |
Improvement to Right Main Canal from RD 69370m to
9370m of Salki Irrigation Project. |
478000 |
393504 |
268110 |
84496 |
- do - |
|
3 |
- do - |
Imp. to Sarasara Distributary and its off-taking canal
of Right Main Canal of S.I.P. |
400000 |
300380 |
126360 |
99620 |
- do - |
|
4 |
- do - |
Imp. to Bandhapathara Minor & Gudapada Minor of Kulimunda Disty. of Salki Irrigation Project. (2426002/FP-Canal/2571) |
182000 |
159880 |
169110 |
22120 |
- do - |
|
5 |
- do - |
Imp. to Birnarsingpur Disty of Salki Irrigation Project. (2426002/FP-Canal/2572) |
99700 |
86270 |
78840 |
13430 |
- do - |
|
6 |
- do - |
Imp. to Bishnupur Minor of Salki Irrigation Project.
|
250000 |
53396 |
51840 |
196604 |
- do - |
|
7 |
- do - |
Imp. to Bharatpur Disty. from RD 2000m to 4126m of
Salki Irrigation Project. |
250000 |
100464 |
101520 |
149536 |
- do - |
|
8 |
- do - |
Imp. to Radhanagar Disty. of Salki Irrigation Project. (2426002/FP-Canal/2575) |
249900 |
155872 |
88560 |
94028 |
- do - |
|
9 |
- do - |
Imp. to Mathura Minor of Salki Irrigation Project. |
200000 |
66036 |
64800 |
133964 |
- do - |
|
10 |
- do - |
Imp. to Kelakata Minor & Brundaban Minor of S.I.P. (2426002/FP-Canal/2577) |
99960 |
93877 |
49680 |
6083 |
- do - |
|
11 |
- do - |
Imp. to Landibandha Disty. from RD 00 to
4500m of Salki Irrigation Project. |
229300 |
97324 |
35640 |
131976 |
- do - |
|
12 |
- do - |
Imp. to Raghunathpur Minor of Salki Irrigation Project. (2426002/FP-Canal/2580) |
100000 |
94136 |
88560 |
5864 |
- do - |
|
13 |
- do - |
Imp. to Kulimunda disty.& its off-taking canal from
RD. 4176 to 9200m |
319000 |
191083 |
268877 |
127917 |
- do - |
|
|
|
Total |
6032860 |
2302087 |
1886890 |
3730773 |
|
|
14 |
Boudh |
Bank protection to Tetelenga Sub-Minor
from RD 1710m to 2411m to 2883m of Salki Irrigation Project. |
2570000 |
1725936 |
980696 |
844064 |
Progress |
|
15 |
- do - |
Imp. to RMC from RD 00m to 540m of Salki Irrigation
Project. |
300000 |
223104 |
195480 |
76896 |
- do - |
|
16 |
- do - |
Imp. to Issirisinga Disty. & Olanda Disty.
& its off-taking canal of S.I.P. |
203000 |
49232 |
25020 |
153768 |
- do - |
|
17 |
- do - |
Imp. to Kulimunda Disty. & its off-taking canal in
between RD 4300m to 9200m of Salki Irrigation Project. |
598000 |
518338 |
460080 |
79662 |
- do - |
|
18 |
- do - |
Imp. to Govindpur Minor of Salki
Irrigation Project. |
583000 |
407820 |
227842 |
175180 |
- do - |
|
19 |
- do - |
Imp. to Gudapada Disty. & Bastampur Disty
of Salki Irrigation Project. |
200000 |
119970 |
103230 |
80030 |
- do - |
|
20 |
- do - |
Imp. to Tulasipur Disty., Palaspat,
Mundipadar & Sangrampur Minor of Salki Irrigation Project. |
200000 |
27360 |
40320 |
172640 |
- do - |
|
21 |
- do - |
Imp. to Ainlapali Minor & Dantapali Minor
of Salki Irrigation Project. |
200000 |
75420 |
76590 |
124580 |
- do - |
|
22 |
- do - |
Imp. to LMC from RD 22000m to 24000m of
Salki Irrigation Project. |
200000 |
102660 |
101340 |
97340 |
- do - |
|
23 |
- do - |
Imp. to Bohira Disty. of Salki Irrigation
Project. |
200000 |
125592 |
125592 |
74408 |
- do - |
|
24 |
- do - |
Imp. to Baunsuni Disty. & Jalai Disty of Salki
Irrigation Project. |
200000 |
125640 |
103680 |
74360 |
- do - |
|
25 |
- do - |
Imp. to Damurugarh Minor & Kankala Minor of Salki
Irrigation Project. |
200000 |
108000 |
108000 |
92000 |
- do - |
|
26 |
- do - |
Improvement to Kantha Rajabandha of Ainlapali Minor of
Salki Irrigation Project. |
1057000 |
583816 |
265257 |
473184 |
- do - |
|
27 |
Boudh |
Imp. to Dungibandha field channel of Baunsuni village
of Salki Irrigation Project. |
915600 |
|
-- |
915600 |
Progress |
|
28 |
- do - |
Imp. to Left Main Canal from RD 22700m to 23300m of
Baunsuni village of SI.P. |
1090000 |
364472 |
121725 |
725528 |
- do - |
|
29 |
- do - |
Renovation of causeway & canal embankment of LMC near
RD 14600m of Salki Irrigation Project. |
980700 |
139249 |
124204 |
841451 |
- do - |
|
30 |
- do - |
Imp. to Balakira Distributary, service rod & canal
bank of Salki Irrigation Project. |
303000 |
110930 |
49820 |
192070 |
- do - |
|
31 |
- do - |
Imp. to Tulasipur Disty. of Salki Irrigation Project.
|
179000 |
19980 |
19080 |
159020 |
- do - |
|
32 |
- do - |
Imp. to Damurugarh Minor of Salki Irrigation Project.
|
283700 |
167956 |
136517 |
115744 |
- do - |
|
33 |
- do - |
Imp. to Kamalpur Irrigation Office Tank & Approach
Road of S.I.P. |
635500 |
308302 |
182873 |
327198 |
- do - |
|
|
|
Total |
11098500 |
5303777 |
3447346 |
5794723 |
|
|
|
|
G. Total |
17131360 |
7605864 |
5334236 |
9525496 |
|
2010-11
|
1 |
Boudh |
Imp. to Right Main Canal from RD 3690m to 5910m of
Salki Irrigation Project. |
634400 |
-- |
-- |
634400 |
Progress |
|
2 |
- do - |
Improvement to Left Main Canal from RD 18600m to
22000m of Salki Irrigation Project. |
481700 |
-- |
-- |
481700 |
- do - |
|
3 |
- do - |
Imp. to L.M.C. from RD 8445m to 13320m of S.I.P. |
1087700 |
-- |
-- |
1087700 |
- do - |
|
4 |
- do - |
Imp. to L.M.C. from RD 13320m to 18600m of S.I.P. |
854400 |
-- |
-- |
854400 |
- do - |
|
|
|
Total |
3058200 |
-- |
-- |
3058200 |
|
|
5 |
Harabhanga |
Imp. to Kulimunda Disty. from RD 00 to 4.300 km of
Salki Irrigation Project. |
424000 |
58320 |
-- |
365680 |
- do - |
|
6 |
- do - |
Imp. to R.M.C. from RD 25353m to 28000m of Salki
Irrigation Project. |
234000 |
127440 |
42120 |
106560 |
- do - |
|
7 |
- do - |
Reno. to R.M..C from RD 20500m to 24300m of Salki
Irrigation Project |
307300 |
113580 |
-- |
193720 |
- do - |
|
8 |
- do - |
Reno. to Naikpada Disty. & Nanikpada Mnior of Salki
Irrigation Project |
471900 |
121116 |
59400 |
350784 |
- do - |
|
9 |
- do - |
Imp. to Naikpada Distributary from RD 2052m to 2272m
of S.I.P. |
513200 |
132688 |
-- |
380512 |
- do - |
|
10 |
- do - |
Reno. to R.M.C. from RD 9370m to 10600m of Salki
Irrigation Project |
170500 |
139500 |
-- |
31000 |
- do - |
|
11 |
- do - |
Reno. to B.N. Pur, B. Ch. Pur Disty. , 33L Mnior of
Salki Irrigation Project |
311200 |
62952 |
57240 |
248248 |
- do - |
|
12 |
- do - |
Reno. to Pankual Disty., Badasu-balaya & Karadi Mnior
of S.I.P. |
337700 |
73620 |
65880 |
264080 |
- do - |
|
13 |
- do - |
Reno. to R.M..C from RD 24300m to 25300m of S.I.P. |
78400 |
|
-- |
78400 |
- do - |
|
14 |
- do - |
Reno. to Nuapada Disty., Ghorada, Mangalpur Minor of
Salki Irrigation Project |
392000 |
20636 |
17820 |
371364 |
- do - |
|
15 |
Harabhanga |
Renovation of Deogarh Disty., Talbahal Minor of S.I.P. |
221400 |
112362 |
121680 |
109038 |
Progress |
|
16 |
- do - |
Reno. of R.M.C. from RD 10600m to 12800m of S.I.P. |
249200 |
|
-- |
249200 |
- do - |
|
17 |
- do - |
Reno. to R.M..C from RD 18500m to 20500m of Salki
Irrigation Project |
270400 |
103680 |
100440 |
166720 |
- do - |
|
18 |
- do - |
Reno. to R.M..C from RD 17000m to 18500m of Salki
Irrigation Project |
306500 |
|
-- |
306500 |
- do - |
|
19 |
- do - |
Reno. of R.M.C. from RD 12800m to 15000m of S.I.P. |
244700 |
|
-- |
244700 |
- do - |
|
20 |
- do - |
Reno. to Naikpada Disty. & Bethiabereni Minor of S.I.P.
|
203400 |
114636 |
110160 |
88764 |
- do - |
|
21 |
- do - |
Reno. to R.M..C from RD 16000m to 17000m of Salki
Irrigation Project |
136900 |
77760 |
-- |
59140 |
- do - |
|
22 |
- do - |
Reno. to Balarampur Disty. , S.S. Pur, Pargalpur Minor
& 11L Minor of S.I.P. |
322200 |
67616 |
-- |
254584 |
- do - |
|
23 |
- do - |
Reno. to Sansubalaya Disty. , Bargha Minor of S.I.P. |
436800 |
81656 |
71280 |
355144 |
- do - |
|
24 |
- do - |
Reno. to Naikpada Disty. from RD 00m to 213m of Salki
Irrigation Project. |
468500 |
412374 |
278732 |
56126 |
- do - |
|
25 |
- do - |
Imp. to service road of Landibandha Disty. of left
bank of Salki Irrigation Project |
494300 |
29579 |
-- |
464721 |
- do - |
|
|
|
Total |
6594500 |
1849515 |
924752 |
4744985 |
|
|
|
|
G. Total |
9652700 |
1849515 |
924752 |
7803185 |
|
BLOCKWISE EXISTING LIPS & ACHIEVEMENT 2010-11 (TO BE OPERATED BY PANI PANCHAYATS)
|
Sl. No
|
Name of the Block |
Total existing LIPs |
Nos. of LIPs handed over to PPs |
Nos of Defunct Lift Irrigation Projects. |
Nos. of LIPs operated and area irrigated |
|||||||||||||
|
Nos |
Designed Ayacut (in Ha.) |
Nos |
Designed Ayacut (in Ha.) |
Nos of Temporary Defunct LIPs with OLIC |
Nos of Temporary Defunct LIPs with pani panchayat |
Nos of Temporary Defunct LIPs with OLIC |
Total |
Nos. of LIPs programmed for Rabi 2010-11 |
||||||||||
|
Nos |
Designed Ayacut (in Ha.) |
Nos |
Designed Ayacut (in Ha.) |
Nos |
Designed Ayacut (in Ha.) |
Nos |
Designed Ayacut (in Ha.) |
Nos |
Designed Ayacut (in Ha.) |
Programmed Ayacut (in Ha.) |
Nos |
Area in Ha. |
||||||
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
17 |
18 |
19 |
|
1 |
Boudh |
101 |
2568 |
101 |
2568 |
- |
- |
16 |
356 |
0 |
0 |
16 |
356 |
85 |
2212 |
1704 |
61 |
870 |
|
2 |
Harabhanga |
105 |
2784 |
99 |
2564 |
- |
- |
34 |
788 |
6 |
220 |
40 |
1008 |
65 |
1776 |
1294 |
50 |
710 |
|
3 |
Kantamal |
130 |
3494 |
130 |
3494 |
- |
- |
2 |
40 |
0 |
0 |
2 |
40 |
128 |
3454 |
2550 |
93 |
1234 |
|
|
Total |
336 |
8846 |
330 |
8626 |
- |
- |
52 |
1184 |
6 |
220 |
58 |
1404 |
278 |
7442 |
5548 |
204 |
2814 |
INSTALLATION OF NEW O.L.I.C. PROJECTS OUT OF B.K.V.Y. GRANT 2009-10
(SANCTIONED IN XI & XII SLSC) (RIDF TRANCHE-XV) UNDER L.I. SUB-DIVISION, BOUDH
| Sl. No | Name of the Block | No. of Lift Irrigation Projects sanctioned | No. of LIPs dropped | No. of LIPs was taken up | Ayacut area to be covered in Ha. | Year of funding | Total estimated cost | 20% W.U.A. Share | Amount sanctioned (80%) of Estimated cost for Non-KVK District | funds release | Expenditure incurred | U.C. Submitted | Balance U.C. to be submittd | Physical Achievement | Remarks |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 |
| 1 | Boudh | 5 | Nil | 5 | 120 | 2009-10 | 48.55482 | 9.71097 | 38.84385 | 38.84000 | Nil | Nil | 38.84000 | works in progress | |
| 2 | Harabhanga | 8 | Nil | 8 | 192 | 2009-10 | 79.52862 | 15.90572 | 63.62290 | 63.62290 | Nil | Nil | 63.62290 | works in progress | |
| 3 | Kantamal | 14 | Nil | 14 | 336 | 2009-10 | 149.07000 | 29.81400 | 119.25600 | 119.25600 | Nil | Nil | 119.25600 | works in progress | |
| Total | 27 | Nil | 27 | 648 | 277.15344 | 55.43069 | 221.72275 | 221.72275 | Nil | Nil | 221.72275 |
INSTALLATION OF NEW O.L.I.C.
PROJECTS OUT OF B.K.V.Y. GRANT-2009-10
UNDER L.I. SUB-DIVISION, BOUDH (SANCTIONED IN THE XII SLSC)
| Sl.No | Name of the Block | No. of Lift Irrigation Projects sanctioned | No. of LIPs dropped | No. of LIPs was taken up | Ayacut area top be covered in Ha. | Year of funding | Total estimated cost | 20% W.U.A. share | Amount sanctioned (80%) of Estimated Cost for Non- KVK District | Funds releasd | expenditure incurred | U.C. submitted | Balance U.C. to be submitted | Physical Achievment | Remarks |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 |
| 1 | Harabhanga | 5 | Nil | Nil | 120 | 2010-11 | 49.11 | 9.8 | 39.26 | 39.29 | Nil | Nil | 39.29 | work in progress | work in progress |
| 2 | Kantamal | 4 | Nil | Nil | 96 | 2010-11 | 38.63 | 7.73 | 30.9 | 30.9 | Nil | Nil | 30.9 | work in progress | work in progress |
| Total | 9 | Nil | Nil | 216 | 87.74 | 17.55 | 70.19 | 70.19 | Nil | Nil | 70.19 | work in progress | work in progress |
REVIVAL OF DEUCNCT OLIC PROJECTS (29 NOS) OUT OF B.K.V.Y. GRANT 2010-11
(SANCTIONED IN XII SLSC DURING THE YEAR 2008-09)
Year of funding - 2010-11
| Sl.No. | Name of the Block | No.of L.I. projects to be revived | Ayacut area in Ha. | Total estimated cost in Rs. Lakhs | 20% W.U.A. Share | 80% of Estimated cost for Non-KVK Districft | Release of funds | Remarks |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
| 1 | Boudh | 5 | 112 | 29.839 | 5.967 | 23.872 | 23.872 | Works in progress |
| 2 | Harabhanga | 24 | 480 | 171.136 | 34.227 | 136.909 | 136.909 | Works in progress |
| Total | 29 | 592 | 200.975 | 40.194 | 160.781 | 160.781 | Works in progress |
PROPOSED LIFT IRRIGATION PROJECTS TO BE TAKEN UP UNDER BIJU KRUSHAK VIKASH
YOJANA
(B.K.V.Y-XIV SLSC) FOR NABARD FUNDING DURING THE FINANCIAL YEAR 2010-11.
| Sl.No. | Name of the Block | No.of Lift irrigation projects to be taken up | Ayacur area to be covered in Ha | Total estimated cost in Rs.Lakhs | 20% W.U.A. share | 80% of Estimated cost for Non KVK district | Remarks |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| 1 | Boudh | 81 | 1944 | 972 | 194.4 | 777.6 | Plan & estimates of these L.I.Ps have been submitted to the Addl. Secretary ,Water Resources Deptt. Govt. of Orissa, Bhubaneswar vide Lr.No. 629(WE) dtd. 6.09.10 of the Collector, Boudh |
| 2 | Harabhanga | 54 | 1296 | 648 | 129.6 | 518.4 | |
| 3 | Kantamal | 75 | 1800 | 900 | 180 | 720 | |
| Total | 210 | 5040 | 2520 | 504 | 2016 |
REVIVAL/ REPAIR / RESTORATION OF INOPERABLE O. L.C
OUT OF S.R.C GRANT' 2010-11 (DROUGHT GRANT '2010-11)
Rs. In lakhs
| Sl.No | Name of the Block | Nos of OLIC projects involved | Ayacut area in Hact. | Estimated cost in Rs. Lakh | Sanctioned amount in Rs. Lakh | Amount released from Dist. Admn. | Expenditure incurred | U/C submitted | Balance U/C to be submitted | Present status of the projects |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
| 1 | Boudh | 47 | 996 | 20.78 | 20.78 | 20.78 | 14.41215 | 14.41215 | 6.36785 | Works in progress |
| 2 | Harabhanga | 27 | 732 | 13.83 | 13.83 | 13.83 | 10.30095 | 10.30095 | 3.52905 | Works in progress |
| 3 | Kantamal | 25 | 636 | 15.39 | 15.39 | 15.39 | 5.88863 | 5.88863 | 9.50137 | Works in progress |
| Total | 99 | 2364 | 50 | 50 | 50 | 30.60173 | 30.60173 | 19.39827 |
REPAIR/REVIVAL OF 05 NOS O.L.I.C.
PROJECTS OUT OF
S.R.C.
GRANT 2010-11 RECIVED THROUGH HEAD OFFICE O.L.I.C., BHUBANESWAR.
| Sl.No | Name of the Block | Nos of OLIC projects involved | Ayacut area in Hact. | Estimated cost in Rs. Lakh | Sanctioned amount in Rs Lakh | Amount released from Dist. Admn. | Expenditure incurred | U/C submitted | Balance U/c to be submitted | Present status of the projects |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
| 1 | Boudh | 3 | 68 | 3.55 | 3.55 | 3.55 | Nil | Nil | 3.55 | Works in progress |
| 2 | Harabhanga | 1 | 40 | 2.82 | 2.82 | 2.82 | Nil | Nil | 2.82 | Works in progress |
| 3 | Kantamal | 1 | 20128 | 1.4 | 1.4 | 1.4 | Nil | Nil | 1.4 | Works in progress |
| Total | 5 | 20236 | 7.77 | 7.77 | 7.77 | Nil | Nil | 7.77 |
REPAIR/RESTORATION OF O.L.I.C. PROJECTS OUT OF F.D.R. 2008 GRANT (5TH PHASE)
(FUNDS WAS RELEASED DURING 2010-11)
| Sl.No | Name of the Block | Nos of OLIC projecs involved | Ayacut area in Hact. | Estimated cost in Rs. Lakh | Sanctioned amount in Rs Lakh | Amount releasd from Dist. Admn. | Expenditure incurred | U/C submitted | Balance U/c to be submitted | Present status of the projects |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
| 1 | Boudh | 8 | 160 | 23.67 | 23.67 | 23.67 | Nil | Nil | 23.67 | Works in progress |
| 2 | Harabhanga | 3 | 60 | 5.75 | 5.75 | 5.75 | Nil | Nil | 5.75 | Works in progress |
| 3 | Kantamal | 1 | 20 | 4.73 | 4.73 | 4.73 | Nil | Nil | 4.73 | Works in progress |
| Total | 12 | 240 | 34.15 | 34.15 | 34.15 | Nil | Nil | 34.15 |
INSTALLATION OF NEW O.L.I.C. PROJECTS OUT OF W.O.D.C. GRANT UNDER L.I. SUB-DIVISION, BOUDH
| Sl.No | Name of the Block | No.of Lift Irrigation Projects sanctioned | Ayaut area to be covered in Ha. | Year of funding | Total estimated cost in Rs. Lakhs | Amount sanctioned in Rs. Lakhs | Amount released in Rs. Lakhs | Balance amount to be released in Rs. Lakhs | Expenditure incurred & U.C. submitted in Rs. Lakhs | Project Status | Remarks |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| 1 | Harabhanga | Maulsinga-II | 20 | 2010-11 | 15.00 | 15.00 | 13.00 | 2.00 | Nil | Works in progress | |
| 2 | Kantamal | Deulidunguri-II | 20 | 2010-11 |