|| Agriculture || Horticulture || Fisheries || Animal Husbandry ||
|
1. |
Total Geographical area |
358292 hect |
|
2. |
Cultivated area |
85500 hect |
|
3. |
Paddy land |
64000 hect |
|
|
(a) High land |
33300 hect |
|
|
(b) Medium land |
19400 hect |
|
|
(c) Low land |
11300 hect |
|
4. |
Other crop area |
21500 hect |
|
5. |
Irrigated area in Khariff :- |
35,713 hect. |
Name of Irrigation Source |
No. |
Ayacut area in Hect. |
|
|
|
|
|
a) Salki Medium Irrigation project |
1 |
19891.00 |
|
b) Minor Irrigation project |
57 |
10780.00 |
|
c) Lift Irrigation project |
137 |
1520.00 |
|
d) W.H.S./Diversion weir |
42 |
522.00 |
|
e) Dugwell |
3721 |
1450.00 |
|
f) Others |
|
1550.00 |
|
Total :- |
|
35,713.90 |
The Climatic condition of this district is subtropical, hot and dry in summer, cold dry in winter and hot humid in rainy season. In summer, temperature reaches to 45°c and temperature may come down to 10°c. The rainfall is not normal and variation. However basing on the climatic condition and uneven distribution of rainfall, the cropping programme has been chalked out.
3. Implementation of Schemes :-
1. Crop Coverage Rabi 2010 – 11 :-
(Fig. in Hectres)
|
Sl No |
Name of the Crop |
Target |
Coverage |
|
1 |
Paddy |
800 |
820 |
|
2 |
Total Wheat |
620 |
600 |
|
3 |
Total Maize |
100 |
85 |
|
4 |
Total Pulses |
23050 |
23160 |
|
5 |
Total Oilseed |
4155 |
4150 |
|
6 |
Total Vegetable |
8966 |
8900 |
|
7 |
Total Spices |
1229 |
1225 |
|
8 |
Sugarcane |
300 |
180 |
|
|
Total |
39220 |
39120 |
2. Seed Supply & Sale Position :-
(Fig. in Qtl .)
|
Sl No |
Name of the Seed |
Target |
Quantity supplied |
Quantity Sold |
|
1 |
HYV.Paddy |
200.1 |
286.20 |
286.20 |
|
2 |
Wheat |
360 |
242.0 |
242.0 |
|
3 |
F.Pea |
48 |
50.10 |
50.10 |
|
4 |
Mung |
115 |
71.20 |
71.20 |
|
5 |
Biri |
91.0 |
0 |
0 |
|
6 |
Til |
0.6 |
0 |
0 |
|
7 |
Sunflower |
3 |
2.30 |
2.30 |
|
8 |
G.Nut |
138.2 |
0 |
0 |
|
9 |
Mustard |
62.0 |
21.80 |
21.80 |
|
10 |
Gram |
7 |
7.0 |
7.0 |
|
|
Total |
1024.9 |
680.60 |
680.60 |
3. Farm Mechanization ( up to March 2011 )
|
Sl No |
Name of the Implement |
Target |
Achievement |
Sent to APICOL |
|
1 |
Tractor |
78 |
98 |
98 |
|
2 |
Power Tiller |
128 |
51 |
51 |
|
3 |
Paddy Reaper |
22 |
42 |
42 |
|
4 |
Transplanter |
1 |
0 |
|
|
5 |
Power Thresher |
16 |
0 |
|
|
6 |
Power operated Implement |
2 |
0 |
|
|
7 |
Spl. Power Operated Implement ( Auxial flow Thresher ) |
13 |
6 |
6 |
|
8 |
Combine Harvester |
2 |
1 |
1 |
|
9 |
Hydraulic Trailer |
8 |
0 |
|
|
10 |
Manual Implement |
150 |
150 |
150 |
4. Jalanidhi
|
Type of FLIP |
Target |
Achievement |
S.R.C. submitted to APICOL |
|
1 |
2 |
3 |
4 |
|
Dug Well |
276 |
230 |
20 |
|
Bore Well |
245 |
8 |
5 |
|
River Lift |
22 |
-- |
-- |
5. Information on Fertilizer
(Fig. in MT)
|
Sl No |
Name of the Fertilizer |
Target |
Opening Balance |
Received up to January 2011 |
Total |
Sale |
Balance |
|
1 |
Urea |
1620 |
158.05 |
1070.45 |
1228.5 |
1113.2 |
115.3 |
|
2 |
DAP |
870 |
318.2 |
320.0 |
638.2 |
131.7 |
506.5 |
|
3 |
20:20:0 |
410 |
0 |
311.65 |
311.65 |
72.1 |
239.55 |
|
4 |
10:26:26 |
70 |
0 |
0 |
0 |
0 |
0 |
|
5 |
14:35:14 |
55 |
70.15 |
0 |
70.15 |
7.0 |
63.15 |
|
6 |
28:28:0 |
70 |
0 |
0 |
0 |
0 |
0 |
|
7 |
M.O.P |
1310 |
101.0 |
98.0 |
199.0 |
100.85 |
98.15 |
|
8 |
SSP |
65 |
11.3 |
0 |
11.3 |
0 |
11.3 |
|
9 |
20:20:0:13 |
0 |
0 |
20.0 |
20.0 |
0 |
20.0 |
|
10 |
A/S |
25 |
0 |
0 |
0 |
0 |
0 |
|
11 |
12:32:16 |
0 |
154 |
0 |
154.0 |
134.0 |
20.0 |
|
|
Total |
4495 |
812.7 |
1820.10 |
2632.80 |
1558.85 |
1073.95 |
6. Seed Village Programme
(Fig. in Ha)
|
Sl No |
Name of Seeds |
Target |
Achievement |
Remarks |
|
1 |
Paddy |
300 |
357 |
|
|
2 |
Mung |
20 |
7.6 |
|
|
3 |
Biri |
20 |
-- |
|
|
4 |
G.Nut |
50 |
-- |
|
|
|
Total |
390 |
364.6 |
|
7. Supply of Diesel Pump Set .
|
Sl No |
Name of Pump |
Target |
Achievement |
Remarks |
|
1. |
Diesel Pump Set |
1000 |
1000 |
1698 nos of pump sets have been approved by the Collector , Boudh . |
8. BGJY
|
Sl No |
Target |
Achievement |
Remarks |
|
1. |
24 |
-- |
17 nos application collected and 14 nos application sent to Collector , Boudh |
9. Rice Development Programme
|
Sl No |
Component |
Target |
Achievement |
|
1. |
Krushak Divas |
1 |
1 |
|
2. |
Pre-seasonal Training |
1 |
1 |
|
3. |
Block Level Awareness campaign |
3 |
3 |
10. ISOPOM ( Oilseed)
|
Sl No |
Component |
Target |
Achievement |
|
|
1. |
Training of Farmers |
11 |
1 |
|
|
2. |
Farmers Visit outside district |
7 |
Beneficiary already selected & sent to Principal , RITE , Rangeilunda . |
|
|
3. |
Minikits |
( a) Mustard |
425 |
425 |
|
(b) Sunflower |
50 |
50 |
||
|
4. |
Sprayer |
500 |
500 |
|
11. NFSM( Paddy)
( i) Demonstration
|
Sl No |
Demonstrations |
Target |
Achievement |
|
1. |
Improved package practice |
200 |
200 |
|
2. |
SRI |
54 |
54 |
|
3. |
Hybrid |
44 |
44 |
(ii) Minikit Demonstration
|
Sl No |
Paddy Variety |
Target |
Achievement |
|
1. |
KRH-2 |
500 |
500 |
|
2. |
Shahabhagi Dhan |
300 |
300 |
|
3. |
Pratikhya |
150 |
150 |
|
4. |
Ketakijoha |
360 |
360 |
|
5. |
Navina |
300 |
300 |
|
6. |
Barsha Dhan |
360 |
360 |
3884 nos of Sprayers have been supplied in three Blocks for 50%
Subsidy Sale.
326 nos of Hand Winnower has been supplied under NFSM Scheme in three blocks at 50% subsidy sale . 100 nos of Conoweeder and 20 nos of Power Sprayer has also been supplied in three blocks at 50% subsidy sale . Micronutrients and Pesticides are supplied to all Sale Centre for 50% subsidy sale .
(iii) NFSM ( Pulse)
(a) Programme has been made to supply 300 Qtls. of Pulses Seed @ subsidy Rs. 1200/-
per Qtls . Out of which 128.20 Qtls. have so far been supplied .
(b) 100 acres Pulse demonstration @ Rs.2000/- per Acres has already been conducted .
(c) 50 nos Sprinkler sets have been supplied with subsidy of Rs. 10000/- per Sprinkler per Ha.
(d) Gypsum with 50% subsidy for 750 Ha and Micronutrient with 50% subsidy for 500 Ha
has been supplied for sale to the farmers .
12 . Rashtriya Krushi Vikash Yojana (RKVY)
The demonstration of SRI under RKVY 2010 -11 for 60 units @ 10 acre per unit has been distributed among the Asst. Agril. Officer of 3 Blocks of Boudh district ( 20 units per Block) . Demonstration conducted in 600 acres i.e. 200 acres per blocks .
Demonstration of Hybrid Sunflower for 500 Ha has been conducted in three blocks of Boudh District under the Scheme RKVY 2010-11 . The crop is at Flowering stage.
Under the sub scheme “Green Revolution” 118 Qtls of Bio-Fertilizer has been supplied in three blocks of Boudh District under the Scheme RKVY 2010-11 @ 75% subsidy sale to the farmers .
Further , 40 nos Vermi Compost unit and one no Vermi Hatchery has also been programmed for establishment in three blocks of Boudh District under the Scheme RKVY 2010-11 in 50% subsidy limited to Rs. 4000/- per unit of Vermi Compost & Rs. 27500/- per Vermi Hatchery . The work is in progress .
Scheme / Project during the year 2010-11
|
Sl. No. |
Name of the Scheme | PHYSICAL | FINANCIAL | ||||||||||
|
Spill over project |
Target for the year |
Total |
Projects taken up |
Projects completed | Balance |
Spill over amount |
Funds received durig the year |
Total |
Funds utilised |
Balance |
U.C. submitted |
||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 |
| I | Fruit Development (Compact area fruit plantation) | ||||||||||||
| a) | Mango | 140 ha. | 140 ha. | 140 ha. | 140 ha. | 1386000 | 1386000 | 1386000 | 1386000 | ||||
| b) | Citrus (K. Lime) | 16 ha. | 16 ha. | 16 ha. | 16 ha. | 256000 | 256000 | 256000 | 256000 | ||||
| c) | Cashew | 10 ha. | 10 ha. | 10 ha. | 10 ha. | 120000 | 120000 | 120000 | 120000 | ||||
| d) | Banana Sucker | 15 ha. | 15 ha. | 13.28 ha. | 13.28 ha. | 1.72 ha. | 253000 | 253000 | 224100 | 28900 | 224100 | ||
| e) | Banana Tissue Culture | 5 ha. | 5 ha. | 5 ha. | 5 ha. | 156000 | 156000 | 156000 | 156000 | ||||
| Total | 186 ha. | 186 ha. | 184.28 ha. | 184.28 ha. | 1.72 ha. | 2171000 | 2171000 | 2142100 | 28900 | 2142100 | |||
| II | Floriculture Development (Demonstration on farmers field) | ||||||||||||
| a) | Marigold (0.1ha/demonstration) | 40 nos. | 40 nos. | 40 nos. | 40 nos. | 31700 | 31700 | 31700 | 0 | 31700 | |||
| b) | Rose (0.1ha/demonstration | 10 nos. | 10 nos. | 10 nos. | 10 nos. | 35000 | 35000 | 35000 | 0 | 35000 | |||
| c) | Gladioli (0.1ha./demonstration) | 15 nos. | 15 nos. | 15 nos. | 15 nos. | 68000 | 68000 | 68000 | 0 | 68000 | |||
| Total | 65 nos. | 65 nos. | 65 nos. | 65 nos. | 134700 | 134700 | 134700 | 0 | 134700 | ||||
| III | Human Resource Development | ||||||||||||
| a) | Training of farmers (25 nos. of beneficiaries for one day) | 1 no. | 1 no. | 1 no. | 1 no. | 10000 | 10000 | 10000 | 0 | 10000 | |||
| Total | 1 no. | 1 no. | 1 no. | 1 no. | 10000 | 10000 | 10000 | 0 | 10000 | ||||
| IV | Normal Sale of Quality Planting Materials (QPM) | ||||||||||||
| a) | Sale of Coconut Seedlings | 2000 nos. | 2000 nos. | 2000 nos. | 2000 nos. | ||||||||
| Total | 2000 nos. | 2000 nos. | 2000 nos. | 2000 nos. | |||||||||
| V | Backyard Plantation by Women SHG under Mission Shakti | ||||||||||||
| a) | Supply of Quality Planting Materials i.e. Papaya seedlings- 3 nos., Drumstick seedling-1 no. & K. Lime seedling-1 no. | 4800 unit |
4800 unit |
4800 unit |
4800 unit |
96000 | 96000 | 96000 | 0 | 96000 | |||
| Total | 4800 unit |
4800 unit |
4800 unit |
96000 | 96000 | 96000 | 0 | 96000 | |||||
| VI | Subsidised sale of Vegetable Minikit under State Plan | 3000 nos. | 3000 nos. | 3000 nos. | 3000 nos. | ||||||||
| VII | Implementing R.K.V.Y. Programme | ||||||||||||
| a) | Construction of Onion Storage Structure | 100 nos. | 100 nos. | 100 nos. | 100 nos. | 800000 | 800000 | 800000 | 0 | 800000 | |||
| b) | Construction of Vermi Compost Unit | 50 nos. | 50 nos. | 50 nos. | 50 nos. | 375000 | 375000 | 375000 | 0 | 375000 | |||
| c) | Construction of Vermi Hatchery | 1 no. | 1 no. | 1 no. | 1 no. | 27500 | 27500 | 27500 | 0 | 27500 | |||
| d) | Integrated Onion cultivation |
500 unit (@ 0.1 ha./unit) |
500 unit (@ 0.1 ha./unit) |
500 unit (@ 0.1 ha./unit) |
500 unit (@ 0.1 ha./unit) |
180000 | 180000 | 180000 | 0 | 180000 | |||
| e) | Projection of Zero Energy Cool Chamber | 10 nos. | 10 nos. | 10 nos. | 10 nos. | 20000 | 20000 | 20000 | 0 | 20000 | |||
| f) | Demonstration on Single Line Trallis system | 50 nos. | 50 nos. | 50 nos. | 50 nos. | 75000 | 75000 | 75000 | 0 | 75000 | |||
| g) | Field Day | 1 no. | 1 no. | 1 no. | 15000 | 15000 | 15000 | ||||||
| h) | Subsidised sale of Vegetable Minikit | 1911 nos. | 1911 nos. | 1911 nos. | 1911 nos. | ||||||||
| Total | 1492500 | 1492500 | 1477500 | 15000 | 1477500 | ||||||||
| VIII | Micro Irrigation | ||||||||||||
| a) | Installation of Drip/Sprinkler Irrigation |
140.01 ha. |
590 ha. |
730.01 ha. |
390.30 ha. |
390.30 ha. |
339.71 ha. |
1640646 | 5179987 | 6820633 | 4319652 | 2500981 | 4319652 |
| Total |
140.01 ha. |
590 ha. |
730.01 ha. |
408.03 ha. |
408.03 ha. |
321.71 ha. |
1640646 | 5179987 | 6820633 | 4319652 | 2500981 | 4319652 | |
| IX | Integrated Farming in Coconut holding for productivity improvement | ||||||||||||
| a) | Laying out of demonstration plot @ Rs. 17500/-ha. (New) | 10 ha. | 10 ha. | 10 ha. | 10 ha. | 175000 | 175000 | 175000 | 0 | 175000 | |||
| b) | Laying out of Demonstration Plant (LODP) @ Rs. 17,500/- per ha. (2nd year maintenance to 2009-10 Plantation) | 10 ha. | 10 ha. | 10 ha. | 175000 | 175000 | 175000 | ||||||
| Total | 10 ha. | 10 ha. | 10 ha. | 10 ha. | 10 ha. | 350000 | 350000 | 175000 | 175000 | 175000 | |||
| X | Plantation under M.G.N.R.E.G.S. | ||||||||||||
| a) | Mango Plantation (High density) in Beneficiary land | 742 no. projects, 249.4 ha. |
742 no. projects, 249.4 ha. |
632 no.projects, area 214.6 ha. |
632 no. projects, area 214.6 ha. |
110 no. projects, area 34.8 ha. |
10011006 | 10011006 | 8029134 | 1981872 | 7703000 | ||
| Total | 742 no. projects, 249.4 ha. |
742 no. projects, 249.4 ha. |
632 no. projects, area 214.6 ha. |
632 no. projects, area 214.6 ha. |
110 no. projects, area 34.8 ha. |
10011006 | 10011006 | 8029134 | 1981872 | 7703000 | |||
| XI | NMMP | ||||||||||||
| a) | Establishment of Model Nursery (Privte Sector) | 1 no. | 1 no. | 1 no. | 1000000 | 1000000 | 1000000 | ||||||
| b) | Establishment of Small Nursery (Private Sector) | 1 no. | 1 no. | 1 no. | 200000 | 200000 | 200000 | ||||||
| c) | Exposure visit inside the state | 2 nos. | 2 nos. | 2 nos. | 2000 | 2000 | 2000 | ||||||
| d) | District Level Show | 1 no. | 1 no. | 1 no. | 1 no. | 50000 | 50000 | 50000 | 0 | 50000 | |||
| Total | 5 nos. | 5 nos. | 1 no. | 1 no. | 4 nos. | 1252000 | 1252000 | 50000 | 1202000 | 50000 | |||
| XII | ISOPOM (OIL PALM) | ||||||||||||
| a) | Planting material cost | 100 ha. | 100 ha. | 54.73 ha. | 54.73 ha. | 45.27 ha. | 750000 | 750000 | 410475 | 339525 | 410475 | ||
| b) | Maintenance | 100 ha. | 100 ha. | 54.73 ha. | 54.73 ha. | 45.27 ha. | 294400 | 294400 | 251758 | 42642 | 251758 | ||
| c) | Diesel Pump Set | 10 nos. | 10 nos. | 10 nos. | 0 | ||||||||
| d) | Demonstration | 5 nos. | 5 nos. | 5 nos. | 0 | ||||||||
| e) | Exposure Visit | 10 nos. | 10 nos. | 10 nos. | 10 nos. | 30000 | 30000 | 30000 | 0 | 30000 | |||
| f) | Farmers training | 4 nos. | 4 nos. | 4 nos. | 4 nos. | 60000 | 60000 | 60000 | 0 | 60000 | |||
| g) | Drip Irrigation | 100 ha. | 100 ha. | 100 ha. | 0 | ||||||||
| h) | Development waste land | 5 ha. | 5 ha. | 5 ha. | 0 | ||||||||
| Total | 1134400 | 1134400 | 752233 | 382167 | 752233 | ||||||||
Fisheries
Fisheries extension network promoting aquaculture starts with the office of the Asst. Director of fisheries at district level ,which is responsible for the effective operation of the extension system through out the district. It monitors and coordinates the technical wing of the extension system . Fishery extension officers are basically field level extension workers work at village level with active cooperation of fishery demonstrators. Available water resources of Boudh district and area covered under pisciculture is mentioned below.
|
Types Of Resource |
No. |
Area |
Area covered under Pisciculture
|
|
|
|
|
|
No. |
Area |
|
G.P. Tank |
1626 |
1542.20 |
616 |
648.41 |
|
Revenue Tank |
76 |
55.20 |
8 |
24.61 |
|
Private Tank |
508 |
288.10 |
293 |
157.70 |
|
Water Harvesting Structure |
42 |
51.70 |
6 |
11.60 |
|
Minor irrigation Project |
26 |
254.00 |
11 |
52.68 |
|
Mahabandha |
16 |
20.80 |
|
|
|
Total |
2294 |
2212.00 |
934 |
895.00 |
Boudh fish farm is one of the good breeding and rearing govt. farm of the state having 8.5 acre of water area comprising 4.80 acre of breeder tanks and 3.70 acre nursery tank. It also consists of 6 hatcheries and one spawnery for breeding and hatching purposes. During the current year ,the farm has achieved excellent production in spawn by producing 855.75 lakhs of spawn ,against the target of 600 lakhs which is a all time high production ,thus it not only catered to the requirements of as many as ten deficit districts of the state , but it also has inspired the private seed producers by providing them 113 lakhs of spawn. The farm also aims to produce more than 75 lakhs of fry against the target of 65 lakhs. So, out of total fry distribution target of 97 lakhs for the current financial year for the district, 75 lakhs will be met from departmental farms and rest will be met from OPDC, private producers.
Several groups under SGSY scheme have been promoted at Palsakutuni, Dumkutch and Padhel and more are to be promoted for fish farming.
2. Fish Farmers Development Agency ,Boudh
FFDA has been established to popularize fish culture as an alternative means of employment generation and removal of poverty. Asst. director fisheries works as Chief Executive Officer of FFDA. It provides training to the selected beneficiaries, assists in construction and renovation water resources, arranging credit from nationalized banks. The most important gain from FFDA is that aquaculture as a commercially profitable activity has been fully established.
Resource Potential:
Boudh district has a good number of water bodies like tanks, ponds, MIPs suitable for pisciculture. The detailed resource potential of the district is stated below.
|
Sl No |
Resources |
Resources Available |
Suitable for Pisciculture |
||
|
No |
Area in Ha. |
No. |
Area in Ha. |
||
|
1 |
GP Tanks |
1662 |
1563.12 |
690 |
758.47 |
|
2 |
Revenue Tank |
76 |
55.20 |
26 |
27.52 |
|
3 |
Private Tank |
513 |
289.37 |
310 |
165.17 |
|
4 |
Water harvesting structure (WHS) |
50 |
62.90 |
13 |
15.90 |
|
5 |
MIPs |
26 |
254.00 |
16 |
122.14 |
|
6 |
TOTAL |
2327 |
2224.59 |
1055 |
1089.20 |
Besides rivers such as Mahanadi, Telnadi, Baghanadi and Salunki provide good capture fishery resources for the fishermen of the district..
a) Total nos.of Fisherman village- 158
b) Total nos.of Fisherman - 7649
i) Male- 3880
ii) Female- 3769
Most of the Fisherman of this district reside on the bank of river Mahanadi & Tel Nadi who depend upon the capture fishing profession in order to maintain their livelihood.
Different schemes implemented in the district for Fisheries Development.
1 FFDA ( For Development of Inland fisheries, Capture Fisheries )
For all round development of Fisheries Fish Farmers Development Agency (F.F,.D.A) has been constituted in the district with Collector as the Chairman & Asst.Director of Fisheries as the Chief Executive Officer of the Agency. Under FFDA, Project proposals are prepared and sponsored to banks with provision of admissible subsidy which is underlined below.
|
Sl. No. |
Schemes |
Unit |
Amount of Loan (Rs) |
Subsidy admissible |
|
|
O.C. |
SC/ST |
||||
|
1 |
2 |
3 |
4 |
5 |
6 |
|
1. |
Excavation of new tank |
1.00 Acre |
1,20,000/- |
24,000/- |
30,000/- |
|
2. |
Renovation of old tank |
1.00 Acre |
30,000/- |
6,000/- |
7,500/- |
|
3. |
Composite pisciculture |
1.00 Acre |
30,000/- |
4,000/- |
5,000/- |
|
4. |
Integrated pisciculture |
1.00 Acre |
32,000/- |
4,600/ |
8,000/- |
|
5. |
Fresh water prawn culture |
1.00 Acre |
72,000/- |
14,400/- |
18,000/- |
|
6. |
Purchase of aerater/ water pump |
1 Unit |
50,000/- |
12,500/- |
12,500/- |
|
7 |
Short term credit (Inputs) |
1 Ac |
20,000/- |
- |
- |
|
8 |
Net and boat |
1 Unit |
15,000/- |
3000/- |
3000/- |
Besides there is enough financial opportunities for the entrepreneurs for development of fresh water fish / prawn seed hatcheries and production & culture of ornamental fishes.
2. Insurance scheme
Under group accident insurance scheme 5500 active fishermen of the district have been enlisted. The insured does not have to pay the premium as it is shared equally by the State and Govt. of India. In case of death or permanent disability the nominee / insured gets compensation of an amount of Rs.1,00,000/-and Rs. 50,000/- incase of partial disability. Under J.B.Y Insurance scheme the beneficiary/fisherman deposits Rs.100/- as premium value and the matching amount of Rs.100/- is deposited by the Insurance company for a year. In case of death or permanent disability during fishing hours the insured / nominee gets compensation of Rs.75,000/- and Rs.37,500/- incase of partial disability. For normal death there is provision of Rs.30,000/- as compensation.
3. FISH FARM ACTIVITIES
There is a Govt. Fish Farm at district headquarters having total area of 18.54 Ac. and total water area of 10.00 Ac. The farm is used for producing quality fish seed i.e. spawn, fry & fingerlings to meet the demand of fish farmers of the district and other districts also. The production capacity of the farm is 1000 lakhs of spawn and 75 lakhs of fry. Due to adverse weather conditions 578.50 lakhs of spawn and 66.35 lakhs of fish fry could be produced this year.
4. DEVELOPMENT OF INFRASTRUCTURE UNDER SGSY:-
An amount of Rs.15.00 lakhs have been received from DRDA, Boudh under SGSY infrastructure development for remodeling of Boudh Fish Farm. Works like construction of quality control laboratory, Fry packing yard, Remodeling of hatchery complex and electrification etc. have been completed and put to use.
5. EXCAVATION OF MULTIPURPOSE FARM PONDS UNDER NREGS
The Govt. has assigned a target for excavation of 150 nos. of multipurpose farm ponds, 50 in each block under NREGS. The beneficiary should be a Small / Marginal farmer and at least 50% of them should belong to SC / ST. The pond size will be 0.50Ac. with estimated cost varying from Rs.1.15 lakh to Rs.1.50 lakh. The list of 209 beneficiaries have so far been selected. 59 cases has been financially approved by the Collector and work order issued in favour of the beneficiaries. The excavation works are in progress.
TARGET & ACHIEVEMENT IN FISHERIES SECTOR DURING 2010-11 ( As on 28.02.2011 )
|
Sl. No |
Item |
Unit |
Target |
Achievement |
Remarks |
|
1 |
2 |
3 |
4 |
5 |
6 |
|
1. |
Pond Development(FFDA) a) With bank Finance b) Without Bank Finance |
Ha. Ha. |
5.00 5.00 |
2.60 3.14 |
40 loan proposals for dev. of 18.28 ha. tank area pending at bank level. |
|
2. |
Pond Development(NFDB) a) With bank Finance b) Without Bank Finance |
Ha. Ha. |
45.00 10.00 |
0.96 - |
Sponsoring of proposals under NDDB is in progress |
|
|
Release of Subsidy |
Rs. Lakh |
- |
3.15 |
-
|
|
3 |
Stocking of Fish seed in Farmer's tank a) Quantity of seed stocked b)Area of water body stocked |
Lakhs Ha. |
130.00 - |
121.53 - |
- |
|
4. |
Fish Farmer's Training (FFDA) |
Nos. |
30 |
10 |
Trainings will be conducted in April as the funds just received |
|
5. |
Inland Fish Production |
MTs |
3453.00 |
3133.65 |
- |
|
6. |
Provision of Boat & Net under capture fisheries |
Nos. |
20 |
20 |
- |
|
7. |
Coverage of Fishermen under Group Accident Insurance Scheme. |
Nos |
5500 |
5500 |
- |
|
|
Departmental Farm Activities a) Spawn production b) Fry Production c) Fingerling Production d) Revenue Receipt |
Lakhs Lakhs Lakhs Lakhs |
1000.00 75.00 - 7.65 |
578.50 66.35 - 9.30 |
Fish seed production for 2010-11 is over |
|
8. |
Construction of multipurpose farm ponds under NREGS |
Nos. |
150 |
59 |
The works are in progress. |
Animal Husbandry
OBJECTIVES :-
1. To boost the production of milk, egg & meat by adopting modern scientific method.
2. Adequate health care / preventive measures, up-gradation of livestock.
3. To improve the socio-economic condition by providing self-employment opportunities to unemployed youth and to raise the family income.
INTRODUCTION :-
Animal Husbandry is an upcoming sector in Boudh District. Around 80% of the rural households own livestock and earn their supplementary income. Livestock production is an integral part of the rural livelihood systems. Livestock production takes place in millions of small holders, scattered throughout Boudh District. Livestock are an important component of household income in rural area.
The poorer people often depend for a large part of their livelihoods on small and marginal land holdings. However landless people often have little opportunity for their livelihood. Animal Husbandry provides them some subsistence income and nutrition to their family.
Improvement in livestock production is an important pathway for increasing the income of marginal and small farmers and landless labourers, for the uncertainties of crop production. However there is a need to provides an enabling environment in which livestock rearers are able to take advantage of the opportunities, overcome the challenges and meet the threats. Livestock production has the potential to demonstrate appreciable growth by giving right kind of support.
PROVIDE FOLLOWING SERVICES :-
1. Animal Health Care Service (Ex. Deworming, Treatment, Vaccination etc.)
2. Breeding Services (Ex. By doing A.I)
3. Feed & Fodder Development (Ex. By producing hybrid fodder)
4. Marketing Facility (Ex. By producing Egg, Milk & Meat)
5. Extension Services (Ex. Advisory services)
CENSUS FIGURE OF BOUDH DISTRICT :-
|
1. |
Indigenous cattle |
2,24,133 |
|
2. |
Cross bred cattle |
11,026 |
|
3. |
Buffalo |
39,385 |
|
4. |
Sheep |
75,701 |
|
5. |
Goat |
1,11,717 |
|
6. |
Pig |
1,170 |
|
7. |
Poultry |
75,905 |
|
8. |
Duck |
7,113 |
BLOCK WISE CENSUS FIGURE OF BOUDH DISTRICT :-
|
Name of the Block |
C.B. Cattle |
Indigenous cattle |
Buffalo indigenous |
Buffalo improved |
Sheep |
Goat |
Piggery |
Poultry |
Duck |
|
Boudh VD-3, LAC-10 |
3608 |
76342 |
8138 |
- |
25908 |
32137 |
486 |
44603 |
515 |
|
Harabhanga VD-2, LAC-7 |
4507 |
75986 |
15423 |
363 |
22422 |
32415 |
431 |
47765 |
677 |
|
Kantamal VD-2, LAC-9 |
2911 |
71805 |
15263 |
198 |
27371 |
47165 |
253 |
83537 |
5921 |
The following veterinary institutions are now functioning in Boudh District:-
|
1. |
Veterinary Hospital / Veterinary Dispensary |
7 |
|
2. |
Livestock Aid Centre |
26 |
|
3. |
Total |
33 |
|
4. |
Out of which A.I. Centre |
28 |
|
5. |
Non-A.I. Centres |
5 |
|
6. |
Go-mitras |
17 |
DAIRY SECTOR :-
The growing demand of milk and milk product provides opportunity for the rural poor. The total Milk production of Boudh District is 14.5 TMT. In order to increase the present per capita consumption of milk 94gm. per day against the state average 104gm. per day, National average of 220gm. per day. It requires massive awareness campaigns/ training at different levels to attract and encourage rural farmers.
In Boudh there is 1 no. of Milk Chilling Plant of 5000 ltrs. capacity at Charichhak, 3 nos. of Bulk Cooler of 1000 ltrs. capacity at Boudh and 500 ltrs capacity at Manamunda and Kantamal, 48 nos. of Milk Producers Co-operative Societies with 18 nos. of A.I. Centre by OMFED.
The infrastructure development of Dairy Farms to enable practical exposure to dairy management practices will develop the capacity of farmers to manage the livestock resources efficiently. This will facilitate the process of Dairy development through active participation of animal owners. The convergence of supplementary infrastructure support and capacity building will bridge the existing critical infrastructure gaps and add value to the other programme.
Fodder Cultivation is an important part of Dairy development. The total area available under grazing green fodder cultivation in Boudh is 60 ha. The estimated fodder production is 750 tonnes.
So following steps can be taken up for Dairy development -
1. Financing for Dairy Units can be steeped up by Banks along the milk routes.
2. Calf rearing, heifer rearing and commercial dairy proposal are to be encouraged.
3. SHGs may be grouped as Fodder groups. Dairy farming groups, Processing groups, Khoa, Ghee and Panner and linkages among them are to be established and financed for the respective activities.
4. Techniques such as urea treatment of straws may be popularized and the farmers are trained in the technique.
5. Azolla cultivation may be promoted.
SHEEP, GOAT AND PIGGERY DEVELOPMENT :-
There is a heavy demand of meat in Boudh District. The total meat production in Boudh District is around 1.072 TMT. Per capita meat available is 1.3 kg./per year as against National requirement 6 kg./per year with requirement of 11 kg./per year. So Chevon (Goad meat) accounts for 73%, shep mutton 17% and pork & beef 10% of the total meat production.
In Boudh there are two excellent Goat breeds are reared such as i.e. Ganjam and Black Bengal. Similarly two excellent Sheep breeds are reared such as i.e. Ganjam and Bolangir. Due to the emphasis laid in increasing the lending under SGSY all the Banks i.e. Commercial Co-operative and RRBs increased their lending for the sector. Commercial Banks account for 59%, RRBs 37% and Co-operative Banks 4% of the ground level credit for goat farming during the last year. But inadequate supply or availability of quality breeding Bucks, grazing lands and Veterinary infrastructure are major constraints in the sector.
So following steps can be taken up for Sheep and Goat development -
1. Beneficiaries may be advised to follow selective breeding in sheep and goat by hybrid Ram/Buck.
2. Advising beneficiaries to exchange Ram/Buck among the units after 3rd year to prevent inbreeding.
3. Financing silvipasture schemes.
4. Financing meat processing units.
5. Promoting leather processing unit in cluster approach.
6. Pursuing with the Municipalities/NAC for setting up scientific slaughter houses for hygienic meat production.
POULTRY DEVELOPMENT :-
The total Poultry population of Boudh District is 1,75,905 .
The total Egg production in Boudh District is 9.8 million/year.
Per capita availability of Egg is 34nos./year, the National level availability 35nos./year as against requirement of 180/year.
Under SGSY infrastructure fund of Rs. 20 Lakhs one poultry hatchery has been established, which is expected to produce 2.2 Lakhs nos day old chick for backyard poultry i.e. “Vanaraj”.
The positive impact of according Agriculture Status to Poultry in the State is being realized as observed from the steep increase in the Bank lending to this sector in the past two years. However, the decisions taken by the apex committee to promote poultry development such as exemption of the sector from labour laws, supplying power for poultry farming at concessional rates, exemption of maize, broken rice and poultry feed from VAT and entry tax are to be taken up with the Labour Department, OERC and Finance Departments of the State Govt. respectively. There is good potential to set up breeding farms with parent stock of low input technology birds for producing hatching eggs and supplying to Govt. hatcheries.
So following steps can be taken up for Poultry development -
1. Financing for commercial layer and Broiler units.
2. Encouraging broiler meat processing schemes, retail poultry dressing units and egg cart/broiler cart schemes.
3. Financing SHGs for setting up backyard poultry unit with Vanaraja, Giriraja birds.
4. Financing for setting up feed mixing plants.
5. Extending S.T. Loan for maize cultivation.
ACTIVITIES FOR THE YEAR 2009 :-
1. ARTIFICIAL INSEMINATION UNDER NPCBB PROGRAMME :
Target Achievement Percentage
a) Prog. No. of A.I. done:- 5150 2756 54 %
(Statics + Mobile + Go-mitra + OMFED)
(2136 + 146 + 174 + 300 )
b) Prog. No. of progeny borned :- 948 ( Male- 537 Female-411 )
2. HEALTH COVERAGE UNDER ASCAD PROGRAMME :
|
|
Target |
Achievement |
Percentage |
|
a) Prog. No, of cases treated |
: 27,750 |
16,864 |
60% |
|
b) Prog. No, of castration done |
: 2,750 |
1,249 |
45% |
|
c) Prog. No, of deworming |
: 8,445 |
3,764 |
44% |
|
b) Prog. No, of vaccination |
|
|
|
|
HSV BQV FMDV PPRV RD |
: 48,125 : 30,800 : 18,750 : 16,250 : 5,000 |
34,950 32,750 5,000 7,900 ---- |
72% 106% 26% 48% --- |
3. FODDER MINIKIT PROGRAMME UNDER CENTRAL SCHEME :
Kharif : 305 No. of Minikit (Ampicheri , Bazara)
Area covered = 163.75 Ac.
Production = 3880 Qtl. (Kharif)
4. LIVESTOCK BREEDING CUM DIARY FARM :
Target Achievement
a) No. of consuming unit : 18 16
b) Milch & Dry ratio : 1.8 :1 1:1
c) Sale proceed of milk : Rs.3,94,200 Rs.2,38,500
d) Sale proceed of animals : Rs. 22,000 Rs. 19,000
5. PERFORMANCE OF GO-MITRA IN BOUDH DISTRICT :
|
Sl. No. |
Name of the District: Boudh. |
A.I.Done |
|||
|
Name of Block |
Name of Go-mitra center |
Name of the Go-mitra |
During the month |
Progressive Total |
|
|
1. |
Boudh |
Khuntabandh |
Soubhagya Pradhan |
5 |
10 |
|
2. |
Boudh |
Manupali |
Nityananda Khamari |
- |
- |
|
3. |
Kantamal |
Baragochha |
Bipin Khamari |
4 |
14 |
|
4. |
Kantamal |
Baragaon |
Niladri Pradhan |
5 |
10 |
|
5. |
Harabhanga |
Lunibahal (drop out) |
Ranjit Pradhan |
- |
- |
|
6. |
Harabhanga |
Bamanda |
Lalit Bhoi |
5 |
14 |
|
7. |
Boudh |
Bohira |
Prabin Karna |
8 |
34 |
|
8. |
Boudh |
Mursundhi |
Rajendra Jena |
- |
- |
|
9. |
Harabhanga |
Biranarsinghpur |
T.Nilachal Mishra |
5 |
5 |
|
10. |
Harabhanga |
Bandhapathar |
Manoj Pradhan |
- |
- |
|
11. |
Harabhanga |
Banibhusanpur |
Sanjaya Sahu |
- |
- |
|
12. |
Harabhanga |
Chhatrang |
Jamini Behera |
5 |
15 |
|
13. |
Harabhanga |
Kusanga |
Sahadeb Bagh |
5 |
15 |
|
14. |
Kantamal |
Kultajore |
Iswar Rana |
- |
6 |
|
15. |
Kantamal |
Khamanmunda |
Pradeep Bagh |
- |
15 |
|
16. |
Kantamal |
Similipadar |
Dillip Sahu |
7 |
21 |
|
17. |
Harabhanga |
Ramgarh |
Susanta Sethy |
5 |
15 |
|
|
|
|
Total |
54 |
174 |
6: ARTIFICIAL INSEMINATION UNDER NPCBB PROGRAME:
|
Target |
Proportionate target |
Achievement |
Percentage |
|
20602 |
16481(90%) |
12288(February) |
67.33% |
a) Prog. No. of A.I. done: -
|
Static |
Mobile |
Go-mitra |
OMFED |
TOTAL |
|
8995 |
699 |
1127 |
1467 |
12288 |
b) Prog. No. of Progenies Borned: - 3415
Male: 2023
Female 1392
N.B. During the year 2009-10 the District has achieved 67% of the Annual Target in NPCBB Sector i.e. 13,631 against the target 20,602.
7.INFERTILITY CUM HEALTH CAMP:-
|
Sl. No |
Name of the Health Camp |
Date |
No of cases |
|
Tutusinga |
Boudh |
19.8.10 |
28 |
|
Mursundhi |
Boudh |
22.09.10 |
25 |
|
Badhigaon |
Boudh |
10.11.10 |
258 |
|
Baunsuni |
Baunsuni |
25.07.10 |
145 |
|
Badajharkata |
Baunsuni |
20.10.10 |
263 |
|
Khatakhatia |
Manmunda |
23.11.10 |
441 |
|
Patrapali |
Manmunda |
25.11.10 |
276 |
|
Gochhagora |
Kantamal |
5.12.10 |
423 |
|
Ghantapada |
Kantamal |
19.12.10 |
260 |
8: Health Coverage Under ASCAD Programe;
|
Sl. No |
Particulars |
2009-10 |
2010-2011 (February) |
|
1 |
Prog.No, of cases treated |
78898 |
(54851(HQ) + 8892 (muff)=(63743) |
|
2 |
Prog. No, of castration done |
5304 |
Bull calf- 818+Others-3381=4199 |
|
3 |
Prog. No, of deworming |
17413 |
13448 |
|
4 |
Prog. No, of vaccination |
|
|
|
Percentage |
Particular |
Target |
Achievement |
Target |
Prop.target |
February-10 |
|
2009-10 |
2010-11 |
|||||
|
75% |
HSV |
1, 92,500 |
171750 |
3,04,414 |
2,73,972 |
2,05,750 |
|
90% |
BQV |
123200 |
122300 |
134000 |
120600 |
108950 |
|
42% |
FMDV |
75000 |
74750 |
124000 |
111600 |
46900 |
|
56% |
PPRV |
65000 |
52200 |
115000 |
103500 |
57600 |
|
70% |
RD |
20000 |
4700 |
112000 |
100800 |
70400 |
|
67% |
ANTHRAX |
|
|
55000 |
49500 |
33200 |
|
|
GOAT POX |
|
|
0 |
|
29200 |
|
54% |
ETV |
|
|
25000 |
22500 |
12100 |
|
|
OTHERS (Theileriosis) |
|
|
|
|
|
9:- Progress on construction of VDs and LACs sanctioned under RIDF, XIII.
Funds to the tune of Rs 55.25 lakh has been provided to BDOs of this Dist out of RIDF for construction of 1 VD and 11 nos of LACs.
By now work order is issued to all projects by concerned BDOs,but the work is not taking its usual momentum in some cases as follows.
|
SL no |
Name of the Block |
Location of VD/LAC |
Whether land is available |
Whether tender has been finalised |
Progress of construction |
|
1 |
2 |
3 |
4 |
5 |
6 |
|
1 |
Harbhanga |
LAC Harekrishnapur |
Yes |
Deptl |
Plinth level |
|
2 |
Harbhanga |
LAC Sarsara |
Yes |
Deptl |
Lintel level |
|
3 |
Harbhanga |
LAC Kelakata |
Yes |
Deptl |
Lintel level |
|
4 |
Boudh |
VD Baghiapada |
Yes |
Deptl |
Roof level |
|
5 |
Boudh |
LAC Dahya |
Yes |
Deptl |
slab |
|
6 |
Kantamal |
LAC khatakhatia |
Yes |
Deptl |
Roof level |
|
7 |
Kantamal |
LAC Ghantapada |
Yes |
Deptl |
plinth |
|
8 |
kantamal |
LAC Ambagaon |
Yes |
Deptl |
slab |
|
9 |
Kantamal |
LAC Uma |
Yes |
Deptl |
slab |
|
10 |
Kantamal |
LAC Palsaguda |
Yes |
Deptl |
slab |
|
11 |
Kantamal |
LAC Dapala |
Yes |
Deptl |
slab |
|
12 |
Kantamal |
LAC Padarpada |
Yes |
Deptl |
slab |
10:.Approval of proposal for opening of new LAC by Zillaparishad during 2010-11:-
Proposal for opening of four new LACs has been approved in the Zilla Parished meeting held on 31.8.10 which has been communicated to Directorate vide this office memo No.895 dt.3.9.10.and no.1422 dt.15.12.10. The copy of ZP resolution is also submitted to Directorate.
11:-Selection of site for construction of new LAC during 2010-11.
Site selection is completed by our field staff in consultation with respective Revenue Inspectors. The alleneation proposal will be submitted after verification of sites by selection committee,for which Collector Boudh have been appraised vide this office letter no 893 dt 3.9.10.under intimation to Sub collector and concerned tahasildars. The plot no and khata nos of respective to be opened new LACs is as follows.
|
Sl No |
Name of the LAC |
Block |
Plot no |
Khata No |
Area |
|
1 |
Telibandha |
Boudh |
874 |
344 |
0.24Ac |
|
2 |
Sankulei |
Harbhanga |
877 |
211 |
1.25 Ac |
|
3 |
Rengali |
Kantamal |
434 |
72 |
0.28Ac |
|
4 |
Kultajore |
Kantamal |
255 |
195 |
0.46Ac |
12:- DDL and its functioning.:-
DDL is functioning since October 2010. Addl VAS Boudh Dr G.C Bal is in charge of DDL..The contractor is keeping deaf ear to furnish the DDL as far as leaking roof, walls,fixing of wash basin and electrical earthing is concerned for preventing possible electrical casuality in future to come.A fulltime attendant may be posted there for smooth functioning of DDL.
13. Completion of Hatchery building in respect of electricity/water supply/Equipments under SGSY Infrastructure.
Hatchery building is complited in respect of building,electrification Equipments (Fixed on26.10.10). Out of Rs 1.3 lac allotted for electrical three phase line connection Rs 0.7 lac has been utilized leaving 0.6 lac for purchase of diesel generator, two voltage stabilizers and shed with platform for generator,which is not adequate for the same.As the voltage supply is very low, the stabilizer required starting from 50 volts to maintain contineous power as required, the cost of such stabilizers comes to 20000 per piece. Hence excess Rs 60000/-is required excluding cost of generater room., for which Directorate has been informed.
Water connection was done after construction of a sump beside the hatchery and an overhead tank is erected over hatchery building from which water pipe connection is connected to hatchery as well as to Veterinary Dispensary, CDVO Office,DDL and Training hall also, raising concern for smooth operation of the project.
14:Selection of calves for CBCR scheme under RKVY in consultation with OMFED.
All total 66 calves were tentatively selected jointly by Deptt and OMFED of those calves born out of AI from June toOctober. Indent of Feed has already been done for the same and insurance papers has been sent to New India Assurance Co Cuttack. By now it is learnt from OMFED that the calves born out of AI from April to May-10 will be included for selection, accordingly selection will be done in due course.
As per the programme we have to organize four ASCAD camps at block level and one at Dist. lavel. By now Dist camp and camps of all three block camps are over as follows.
|
Name of village |
date |
No of cases treated |
No of farmers trained |
|
Kaleswar (Dist HQ) |
6.2.11 |
252 |
100 |
|
Bulura (Harbhanga) |
10.2.11 |
156 |
50 |
|
Sargipali (Kantamal) |
5.2.11 |
209 |
50 |
|
Baunsuni (Boudh) |
7.2.11 |
152 |
50 |
16.SPONSORING OF APPLICATIONS;-
As desired by Honorable Revenue Divisional Commissioner, Berhampur for taking up dairy finance in massive way in Boudh District, all total 554 applications for dairy loan has been collected covering almost all areas of the District and is submitted to the Manager, Lead Bank in three phases in addition to 12 applications collected for goatery scheme as desired by Collector and Dist. Magistrate Boudh, during focus village meeting at Santumb village.Out of above applications sponsored, 9 villages as follows are feasible to form MPCS as there are more than 10 beneficiaries.
1:- Ghantapada— 28
2:- Baragaon----- 14
3:- Rekdol -------- 12
4:- Tentulikhunti- 9
5:- Srimal--------- 16
6:- Kurukupa----- 15
7:- Bulura--------- 27
8:- Rautpada------ 19
9:- Panigora------- 10
Besides all 49 applications submitted by OMFED come within the MPCS areas for which they will be included as members.Further SGSY groups will be sanctioned and disbursed with dairy animals as proposed.
Further 18 applications for finance under venture capital scheme have been submitted to the Chief Manager Lead bank for finance of at least 10 dairy animals for each applicants which may be sanctioned in new DEDS of NABARD.
During the review of Hon’ble Revenue Divisional commissioner Southern division Berhampur on 6.12.10 at DRDA, each LAC will nurture one SGSY dairy group for which all VASs and LIs of this district are instructed to keep in touch with BDOs of respective blocks as and when required and co operate in selection of illegible SHGs After those are sanctioned with loan, necessary follow up action will be taken as per guide line. After sanction of loan, training will be imparted to the beneficiaries in batches as desired ,before actual disbursement of loan in coming months subject to provision of SGSY training funds from DRDA. As of now BDO Harbhanga have convened a meeting with our field VASs and LIs on 31.12.10 and planned for selection of SGSY groups.
17:-BRGF:-
Funds to the tune of Rs 19.28 have been provided in the year 2008-09 , out of which Rs .12.50 lakh has been utilized so far, as per records available in the Office. . Balance Rs.6.78lakh was meant for purchase of 20 nos of CB cows for LBD farm Boudh for Rs 3.00 lakh and 3.78 lakh for purchase of travices to be supplied to GPs . Order has been placed for purchase of travis and it will be supplied on 10.4.11 as informed by supplier.The cows will be purchased after receiving communication from Directorate regarding policy decision of LBD farm.
18:-CROSS BREED CALF REARING:-
Cross breed calves born from CB and ND cows out of artificial insemination will be given feed from 4 months to 28 months@ 50% subsidy of feed cost .The target for the current year is 200. By now 66 calves are identified and they are already incorporated in the scheme and supplied with calf feed.
19:- DROUGHT:-
Rupees 2.25 crores of funds have been placed with Director Animal Husbandry and veterinary services Orissa for drought relief measures in the district by Collector. After receipt of affected village list from collectorate ,preparation of action plan was done for health camp and cattle feed distribution and submitted to Directorate.
After receipt of Medicines and cattle feed, camps will be done in due course.